Laserfiche WebLink
Onsite Permit 555-24-005834-PRMT-: Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555047337038 <br /> $ Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store +� <br /> t@ t $Ie e s l3 2 Q " ,`at' �" as." ,Per�c., .9'• _ �cs �{, ✓ s $UOtl di�tef +,'L�' `� <br /> a "+b s .mom ;:a a -". 4 • ka,'v - x �^," <br /> y� <br /> ''»"tea '?'"``°..:042 � •.. .F .TM�',� %: ... .. <br /> Conditions of approval: <br /> •This repair permit is for a Tank Only. <br /> Properly decommission the old septic tank and submit appropriate documentation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from <br /> one end of the pipe to the other. In addition,there must be a minimum difference of 8 inches between the invert of <br /> the septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> 8/16/24:9:37:50AM ONS_OnsitePermitr <br />