Septic Permit 555-22-007821-PRMT-01 Page 2 of 3
<br /> 5 s B ,�i+" fix,i7A 1a"q;
<br /> Daat8' .Ct't geOtialie4e4:4), 172,P2. :. h �..:m�^'s azt n'" ' ..�Z ,: �., WE .�..�.i�M` -00`,
<br /> Wot e,[iescn�tian, i FIR f AJ REP/A,UTfi'O RE1 2�BDRM S D T �
<br /> P `` 4 " � � F�i��2;?BDRM�SPD �� � �"
<br /> n , &z� x�'�:. F �;�'C s� n.�ai� �� x x n,"" P.+�`` z � � �`'V` i�,r`a �,� �� � �^ •
<br /> ,:
<br /> n41 .Fax. 4' 'k. �,$,., �x ., `, s��6.e,'..'. z?'sh+ u,'`. �..,
<br /> x S o r ,x,� ti� r E`� �`,c sr.,, r,�yr ,. '_° "k 0':* dt
<br /> a a Conciitla of prDYa�
<br /> ,......: mow..."�?' ,..,. .... :.�^ ,9��a�,.W�;`."'�,^„
<br /> •The owner of a pressurized distribution system must maintain a contract with a certified maintenance
<br /> provider to inspect, adjust and maintain the onsite system.The maintenance provider must submit an
<br /> annual report and annual evaluation fee.
<br /> •Filter fabric required over drain media(rapidly permeable soils).
<br /> •Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with
<br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation.
<br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent).
<br /> •The system must be installed by the property owner or a licensed sewage disposal business (installer).
<br /> •Vehicular traffic and livestock must be restricted from the system area.
<br /> •AII roof drains must be directed away from the system
<br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-
<br /> inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.
<br /> Maintain access to septic tank for pumping and service.
<br /> •Meet all required setbacks
<br /> •The system must be installed in the area approved during the site evaluation and in accordance with the
<br /> construction plan approved by the agent, including any changes made by the agent.
<br /> •AII work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or
<br /> specifications without approval by the agent.
<br /> •For product approval information and manufacturer installation requirements see DEQ website at:
<br /> hftp://www.oregon.govideq/Residential/Pages/Onsite.aspx
<br /> -The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply
<br /> with applicable building, electrical, or other codes.An electrical permit and inspection from the Department
<br /> of Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is
<br /> required for pump wiring installation.
<br /> Install the pump and system components in accordance with the approved pump curve and
<br /> specifications.
<br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in
<br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above.
<br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of
<br /> satisfactory completion of an onsite wastewater treatment system at the location identified above.
<br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will
<br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system.
<br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect
<br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock,
<br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities.
<br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance
<br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or
<br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment
<br /> of an additional fee.
<br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard
<br /> or pollute public waters.
<br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the
<br /> issuance of this Certificate of Satisfactory Completion.
<br /> «�
<br /> •
<br /> �. _..w � tcafe ofSatas otor Cotnple � � � '� „ i
<br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No
<br /> Comments: COSC Issued ok to cover and use
<br /> 8/21/24:3:09:16PM ONS_OnsiteCSCpr
<br />
|