My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12367070
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12367070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 1:23:33 PM
Creation date
9/10/2024 11:53:22 AM
Metadata
Fields
Template:
Permits
Permit Address
9588 FISHERMAN LN NE
Permit City
Aurora
Permit Number
555-24-006424-EVAL
Parcel Number
TEMP MC
Permit Type
Site Evaluation
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Septic Site Evaluation 555-24-006424-EVAL Page 2 of 2 <br /> 4e��.e ' <br /> ppllt d o S'4ra'it ri tlOft#' proved t a°• 2 x <br /> o Ctescrt t oft TURBCJ- 0 4 9 G �^ , � s s t r w <br /> ..:, �>.� • ��- „. ..�..�,- �s�%.7 �...- "x �..`�'°n�3' � .... ' �' �� ,4 & <br /> Groundwater type: Temporary Temporary <br /> Groundwater depth: 22 in. 22 in. <br /> Drainfield type: Capping Fill Capping Fill <br /> Drainfield sizing: 125 linear ft/150 gal. 125 linear ft/150 gal. <br /> Pump to drainfield required: Yes Yes <br /> Conditions of approval: <br /> -THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact this office when you are <br /> ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms until we issue your permit. <br /> .This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the approved system is <br /> constructed under a DEQ construction permit or unless the site is altered without approval from this office.Alterations/excavations/lot line adjustments <br /> made to the site,or placement of wells or utilities,etc.,may invalidate this approval <br /> •If you disagree with the decision of this report,you may apply for a site evaluation report review.The application for a site evaluation report review <br /> must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must Include the site evaluation review fee in OAR <br /> 340-071-0140 Table 9A.A senior DEQ staff person will be assigned the site evaluation report review application. <br /> •You may apply for a variance to the onsite wastewater treatment system rules.The variance application must include a copy of the site evaluation <br /> report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being requested,demonstrate the variance is <br /> warranted,and include the variance fee in OAR 340-071-140 Table 9C.A variance may only be granted if the variance officer determines that strict <br /> compliance with a rule is inappropriate or special physical conditions render strict compliance unreasonable,burdensome or impractical.A senior DEQ <br /> variance officer will be assigned the variance application. <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc., may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report, plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable,burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> Matt Knudsen Onsite Wastewater Specialist 9/5/24 <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules.You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center Is 1-800-332-2344.) <br /> 9/5/24:1:09:44PM Page 2 of 2 ONS_OnsiteEvaluationjr <br />
The URL can be used to link to this page
Your browser does not support the video tag.