Laserfiche WebLink
Septic Site Evaluationnt 55pp5-24-006201-EVAL Page 2 of 2 <br /> �.' O9/O r'• �S.: t "1, • s e 0 +�`'4 ,V;ik f;'r,1 z"v!" o yr:�`uLy'��'r 4 rd'., ..."# ,�; Y«e <br /> zar • <br /> 44 �;. • � � � ��rid � »y` � �' � � �� r <br /> ' ,.; & ��rf:rta» � a �, a :q <br /> plrcatto tuS S v uatio App o� ed; �� ' ` ; a y <br /> o &desc p 1:R S FU »A `. i � u 8 �� <br /> 4 4 - a As t �s Mdy ,o o• <br /> a..ov.xi.,I€,;,ea <.,,;11 ma_�sx .. ,.s�g� r �`�r�;. "�a k:a�8`s.� ,.fix.g,�d'�z m,a..«z.�,�...., t« ' �,. .�v""-.e;+��.'�� ". <br /> Drainfield sizing: 125 linear ft/150 gal. 45 linear ft/150 gal. <br /> Other special requirement: N/A ATT due to limited space due to topography <br /> and trees <br /> THIS IS NOT YOUR PERMIT.A Construction/Installation permit is required before you construct your system.Please contact <br /> this office when you are ready to apply for a construction/installation permit.We cannot sign off on any Building Codes forms <br /> until we issue your permit. <br /> This site approval runs with the land and will automatically benefit subsequent owners.This site approval is valid until the <br /> approved system is constructed under a DEQ construction permit or unless the site is altered without approval from this office. <br /> Alterations/excavations/lot line adjustments made to the site,or placement of wells or utilities,etc.,may invalidate this approval <br /> If you disagree with the decision of this report,you may apply for a site evaluation report review. The application for a site <br /> evaluation report review must be submitted to DEQ in writing within 60 days after the site evaluation report issue date and must <br /> include the site evaluation review fee in OAR 340-071-0140 Table 9A. A senior DEQ staff person will be assigned the site <br /> evaluation report review application. <br /> You may apply for a variance to the onsite wastewater treatment system rules. The variance application must include a copy of <br /> the site evaluation report,plans and specifications for the proposed system,specify the rule(s)to which a variance is being <br /> requested,demonstrate the variance is warranted,and include the variance fee in OAR 340-071-140 Table 9C. A variance may <br /> only be granted if the variance officer determines that strict compliance with a rule is inappropriate or special physical conditions <br /> render strict compliance unreasonable, burdensome or impractical. A senior DEQ variance officer will be assigned the variance <br /> application. <br /> Danielle Brown Onsite Wastewater Inspector 2 9/5/24 <br /> • <br /> CALL BEFORE YOU DIG...ITS THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules.You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 9/5/24:1:13:49PM Page 2 of 2 ONS_OnsiteEvaluation_pr <br />