Laserfiche WebLink
• <br /> , Marion County OREGON SEPTIC SYSTEM REQUIREMENTS AND FIELD NOTES <br /> PUBLIC WORKS <br /> Design Flow GPD <br /> 300 <br /> Initial System Repair System <br /> System Type: System Type: <br /> This is a repair system Seepage Bed <br /> Field Size: Ft^2 Size: 1' Ft^2 <br /> 400 <br /> Size Factor: Ft^2/150 GPD Size Factor: Ft^2/150 GPD <br /> 200 <br /> Install Depth (inches) Install Depth (inches) <br /> Min Max Min 18 Max 36 <br /> Special Requirements <br /> all seepage bed requirements must be met and an o and m agreement is required for the life of the system <br /> Notes & Landscape Features <br /> 100 ft well setback 25 ft setback from ditch to the NNE of the approved area and <br /> a minimum of 50ft setback is required from the highwater mark of the river <br />