Laserfiche WebLink
Onsite Permit 555-24-001447-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555062863775 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> . <br /> pate i• d°2/261 4 � ' g atioi 4 d t 212512• <br /> Special Requirements <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Conditions of approval <br /> •Capping fill rules at OAR 340-071-0265.Construction must occur in dry soil conditions between June 1 and <br /> October 1 unless otherwise approved by the agent.The cap material must be pre-approved by the agent prior to <br /> placement.Minimum 10-ft between edge of fill and trench.Drainfield area must be scarified.Contact between <br /> native soil and fill must be mixed.Final cap to be seeded and or landscaped to prevent erosion. Protect from <br /> livestock and vehicular traffic. <br /> •Serial distribution.The cap material must be evenly graded to a final depth of 16-inches over the <br /> drain media. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •AII tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> -The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> -All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.govkleq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before <br /> connecting to the distribution unit.It must be installed with a minimum fall of 4 inches per 100 feet and <br /> at least 2 inches of fall from one end of the pipe to the other.In addition,there must be a minimum <br /> difference of 8 inches between the invert of the septic tank outlet and either the invert of the header to <br /> the distribution pipe of the highest lateral in a serial distribution field or the invert of the header pipe to <br /> the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length,level,and bedded. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Maximum length of an individual trench is 150-feet. <br /> -Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> 2/26/24:1:26:08PM ONS_OnsitePermitjr <br />