Laserfiche WebLink
Septic Permit 555-24-006534-PRMT Page 2 of 3 <br /> iJtct 1Y �'ae4T74{` 047mdz,4 tr , 5 ye <br /> 1No Desenolon ER BQR` sFD s 4 <br /> 404. <br /> s. = 3.. ...._ ,44 €e .. <br /> tWo A , <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by a person certified <br /> by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative Treatment Technology rules at OAR <br /> 340-071-0345. <br /> •ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the treatment system <br /> malfunctions. <br /> •The septic tank must be approved for use with the ATT system to be installed. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is required to <br /> Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer to inspect, <br /> adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual evaluation fee. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum <br /> diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain access to septic <br /> tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan <br /> approved by the agent, including any changes made by the agent. <br /> •AII work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications without approval <br /> by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with applicable building, <br /> electrical,or other codes.An electrical permit and inspection from the Department of Consumer and Business Services, Building <br /> Codes Division,or the municipality with jurisdiction,is required for pump wiring installation. <br /> -Install the pump and system components in accordance with the approved pump curve and specifications. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. _ <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 464fe bake E fS fto CE E11pretL`Oil t . <br /> System Inspection: Yes Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> 9/9/24:7:35:09AM ONS_OnsiteCSC_pr <br />