Laserfiche WebLink
• <br /> • MARION COUNTY BUILDING INSPECTION <br /> f ' Ill. ' • <br /> • <br /> 3150 Lancaster Dr.N.E.•Suite C*Saiem,Oregon.97305-1398 <br /> • <br /> • Office Hours:8:00-4:30 •-Phone:(503)588-5147 • 24-HR Inspection Line:(503)373-4427 <br /> AUTHORIZATION/ALTERATION PERMIT <br /> DATE/TIME . : G8/25/97 14:26 PERMIT NO : 97-85972 . <br /> • <br /> 4.4.TYPE • : SP• . • STATUS : ISSUED • • <br /> # OCCEIPANG'r' : R-3 . ISSUED : 68/25/1997 - . <br /> TO EXPIRE :' 88/25/1998 <br /> • PAGE ' . 2 . <br /> AUTHORIZATION/ALTERATION PERMIT <br /> This Authorization Notice is..for an inspection of the existing septic system for a RESIDENTIAL <br /> -building. An inspection determined that it did not appear adequate• to serve the purpose proposed. <br /> Based on the results of this study,' site approval has been granted for the installation of a <br /> •new system. .This approval is site specific and must be installed according to the following <br /> sperifications.and the attached site.plan. . . . . <br /> Soils In the approved area shall not be altered or modified by cutting, filling, or other <br /> activities Which would impede the successful operation of the septic system. Observe all <br /> required setback/separation distances during the installation •of the system. . <br /> : - Keep this document with your records. Give a copy of this permit to the septic system <br /> installer prior to the installation of..the system. Any deviation from the approved •plan . <br /> must have prior- approval from this office.. . ,. :. - . • <br /> • The following construction specifica#:i+ins shall apply to the installation of the septic system: <br /> TYPE OF REPLACEMENT SYSTEM: SAND FILTER ' <br /> •. MINIMUM SEPTIC TANK. CAPACITY: 1000•GALLONS . • <br /> • LINEAL FEET OF DRAINFIELD; 150' • • <br /> TYPE OF DISTRIBUTION: EQUAL . <br /> DISPOSAL TRENCH DEPTH: 12INCHES, MINIMUM; 12INCHES, MAXIMUM • ' • <br /> • TOTAL DRAIN.MEDIA DEPTH: 12INCHES <br /> DRAIN. MEDIA UNDER PIPE: 6INCHES . <br /> MINIMUM SOIL BACKFILL: 10INCHES . • <br /> GROUNDWATER INTERCEPTOR: N • <br /> The disposal trenches are constructed two (2) feet wide and on minimum ten (10) foot <br /> centers and with no line' exceeding 125 feet in length. The trenches and perforated • <br /> • pipe are installed level(+/-.one inch) and contoured to follow the natural ground <br /> surface. . . . <br /> COMMENTS AND CONDITIONS • <br /> 1. THIS SEPTIC REVIEW WAS COMPLETED BY LEE GRIMES ON AUGUST 22, <br /> 1997. .SOIL CONDITIONS AT THE TEST PITS ARE MARGINAL TO CON- . • <br /> SIDER. AN ALTERNATIVE SAND FILTER. SYSTEM PLUS A FULL CAPPING <br /> FILL. NOT THE SAND FILTER/CAPPING FILL .SYSTEM MUST BE CON • <br /> - <br /> • STRUCTED •DURING THE DRY SOIL SUMMER SEASON. THE OLD SYSTEM <br /> MUSTIBE PUMPED AND PROPERLY ABANDONED. USE CARE NOT TO ALTER <br /> • THE NATURAL TOPSOIL WITH IN THE DRAINFIELD SITE PRIOR TO IN- ' - <br /> • <br /> STAI.LATION. OBSERVE ALL USUAL SETBACK AND SEPARATION DIS- : • <br /> TANCES. THE FILTER BASE WILL PROBABLY BE RAISED TO PROVIDE . <br /> GRAVITY FLOW TO THE SHALLOW DRAINLINES. • • <br /> . 2.: The attached ORANGE CARD must be posted at the county road. <br /> 3. .For a SAND FILTER SYSTEM see the attached. "Sand Filter <br /> .System Requirements for Flans". Sand Filter design and <br /> construction is very detailed and .a DER licensed contractor -.. <br /> • or consultant is recommended to. assist'with preparation of. <br /> • • ' plans. See the attached list for consultants. The system <br /> • shall be designed and operated as per OAR 340-71-299 through <br /> • 305. Two sets of detailed plans for -the installation of the <br /> . .sand filter system must be submitted at the time application - <br /> 'is made for the permit to install the system. If a site-% • <br /> built concrete box is• used as the sand filter container, a - <br /> separate building permit is -also required. ' <br /> 4. A cappin�g. fill drainfield is required in conjunction with • <br /> the septic system approval. See..th•e attached "Capping Fill" <br /> information sheet for. instructions. <br /> . 5. CAPPING FILL SYSTEMS shall be constructed between June 1 <br /> and October 1 or during such times when building Inspection • <br /> • <br /> . r . <br />