Laserfiche WebLink
Onsite Permit 555-22-002725-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555074989574 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> Date issued T17122 �� 1=acptrafio►i`date ?17123' <br /> , a „ „x ,F -0 e w*_.. 447, <br /> Wark deI;g9pO FIRE MAJ REP 3 BbRM SFDfTO REPL 3 BDRM <br /> Seepage bed specs: 250 square feet(100 sf/150 gpd) Bottomless sand filter sqft: N/A <br /> laterals no more than 2 feet from <br /> sidewall and no more than 4 from <br /> each other. 1/8"orifices 2'spacing, <br /> install 1 downward orifice at end of <br /> each line for seasonal use/winter <br /> months. <br /> Media type: Rock/Pipe Media depth: 12 in. <br /> Trench length: N/A Rock above pipe: 2 in. <br /> Total rock depth: 12 in. Rock below pipe: 9 in. <br /> Max depth: 36 in. Undisturbed soil between trenches: N/A <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements • <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •This repair permit is for replacement of the existing septic system following the Beachie Creek Fire of 2020 <br /> which burned this property.This is a reasonable repair per OAR 340-71-0215(2)and HB 2289.A 25'setback to <br /> the escarpment is required. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual <br /> report and annual evaluation fee. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the <br /> treatment system malfunctions. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance provider is <br /> required to Final this permit. <br /> Pressurized distribution rules at OAR 340-071-0275. Install sweep elbows at ends of lateral piping with <br /> acceptable threaded plugs or caps. Minimum head of 5-ft at remotest orifice, less than 10%variation. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building, electrical, or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services, Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 7/7/22:7:58:17AM ONS_OnsitePermitpr <br />