Laserfiche WebLink
Onsite Permit 555-24-004269-PRMT-01 Page 3 of 4 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555061447721 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> tht.,. x 1 e;14 <br /> pt1Ffdescrr hOn AST l4, ,l og KFOR'3RDR fSF kph" <br /> Conditions of approval <br /> -Properly decommission the old septic tank and submit appropriate documentation. <br /> •A failing system must be repaired as soon as possible.Should the repair of this system be delayed,the <br /> property owner must notify the agent and provide the reasons for delay,and propose a different completion date. <br /> Delays may be cause for formal enforcement action,which may result in civil penalty assessments. <br /> •If there are discharges of sewage or septic tank effluent onto the ground surface or into public waters,the <br /> property owner must take immediate steps to minimize the threat to public health and the environment.These <br /> steps must include at a minimum: <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73.Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the manufacturer <br /> installation guidelines. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> -Effluent sewer.The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from <br /> one end of the pipe to the other. In addition,there must be a minimum difference of 8 inches between the invert of <br /> the septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial <br /> distribution field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> -Header pipe from Distribution or Drop Box must be minimum 4-ft length,level,and bedded. <br /> -Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> -Maximum length of an individual trench is 150-feet. <br /> -Serial distribution,each trench bottom to be level and on contour.Use Drop box(es). <br /> Groundwater Interceptor,Curtain Drain required: Minimum trench width 12-inches.Minimum perf pipe diameter <br /> 4-inches;must meet the requirements in OAR 340-073-0060(4);and must be installed at least 2 inches above the <br /> bottom and along the full length of the trench with a minimum of 10 inches of drain media cover The curtain drain <br /> must be filled with drain media to within 12 inches of the ground surface with filter fabric placed over the media. <br /> The outlet pipe(s)must be rigid smooth-wall,solid PVC pipe meeting or exceeding ASTM Standard D-3034 with a <br /> minimum diameter of 4 inches.A flap gate or rodent guard must be installed.The curtain drain must extend at <br /> least 6 inches into the layer that limits effective soil depth or to a depth adequate to effectively dewater the site. <br /> 7/3/24:9:45:52AM ONS_OnsitePermitjr <br />