My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12399446
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
24-XXXXX
>
12399446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 3:46:26 PM
Creation date
10/2/2024 4:44:57 PM
Metadata
Fields
Template:
Permits
Permit Address
817 MEADOWS LN SE
Permit City
Jefferson
Permit Number
555-24-003674-PRMT
Parcel Number
093W15B 00601
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-24-003674-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555061773526 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> .c.: roar h as^s '"" t s ? q ae ;: a.'� e s -,e+,s�r <br /> Date jssuQd Sl27f24 • " o. .: �r �` tratloit date, f2Tf25 <br /> Oki " <br /> w- fides pttan-M1kJ�i P FQ,, 3ERR SFE'r , $ " y -4"4 <br /> ,�, t�.- a:, t ens•- .m # .,? O s' -� "r,�,e f" `afi.s � ° o _ "%:� .. . ;, . . At <br /> Max depth: 20 in. Undisturbed soil between trenches: 8 ft. <br /> Min depth: 18 in. Capping fills-min depth of fill material: N/A <br /> Special Requirements <br /> Stake out required: No <br /> Groundwater type: Temporary Groundwater depth: N/A <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: N/A <br /> Other special rqmt: per OAR 340-071-0220(5)(c)distribution box or drop box is required at each line <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by a person certified by <br /> the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative Treatment Technology rules at OAR <br /> 340-071-0345. <br /> -ATT treatment standard 1 required. <br /> •The ATT system must be designed to prevent untreated waste from passing into the absorption field if the treatment system <br /> malfunctions. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is required to <br /> Final this permit. <br /> -The owner of an ATT system must maintain a contract with a maintenance provider certified by the manufacturer to <br /> inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual report and annual <br /> evaluation fee. <br /> •Dry soil installation only(June 1—October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch minimum diameter if less <br /> than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain access to septic tank for pumping and service. <br /> .Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the construction plan approved <br /> by the agent,including any changes made by the agent. <br /> •All work is to conform to OAR 340,Division 71 and 73.Make no changes in system location or specifications without approval by the <br /> agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.Oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •The pump and alarm must be wired on separate circuits in the control panel.Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of Consumer <br /> and Business Services,Building Codes Division,or the municipality with jurisdiction,is required for pump wiring <br /> installation. <br /> A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer or <br /> pressure transport pipe from tank to drainfield. <br /> •The hydrosplitter must be located at least 6 inches higher than the piping in the highest disposal trench to ensure <br /> that effluent in the top line does not spill back into the hydrosplitter. <br /> -The system using a hydrosplitter is to be pressurized only to the hydrosplitter,and is to utilize gravity flow from the <br /> hydrosplitter to the disposal trenches. <br /> -The hydrosplitter must be enclosed in a secure enclosure with a solid,watertight bottom to eliminate the effect of <br /> rodents filling the enclosure with soil. <br /> 6/27/24:12:44:08PM ONS_OnsitePermit pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.