Laserfiche WebLink
iBalsiger Shewbridge & AssOciates, <br /> <br />October 16, 1979 <br /> <br /> A,t,A, Architects/Planners <br /> <br />(503) 682-3023 <br /> <br />MEMORANDUM <br /> <br />Subject: Meeting at North Marion Middle School Site <br /> Concerning Septic System <br /> <br />Garry Messer, R~S., State of Oregon DEQ <br />Robert Foster, R.S., Marion County <br />Glenn Thompson, Engineer, McGinnis/Kimmel <br />Bruce Bader, Architect, Balsiger, Shewbridge & Associates <br /> <br />The Statement of Feasibility, dated 5/17/76 was. discussed. <br /> <br />a. The designated location of the Repair Area is not acceptable <br /> and should not have been shown. <br />b. The designated Sewage Disposal Area may be expanded. <br /> <br />A test hole was made by Messer approximately 300' North of the <br />South property line which indicated satisfactory soil conditions <br />for the drain field. <br /> <br />Messer stated that there would be no reason for relocating the <br />building from the position shown on Architect's Sheet No. G-I. <br /> <br />Messer, Foster, and Thompson will work out the details of the <br />septic system and repair area. <br /> <br />.BALS!GER, SHEWBRIDGE & ASSOCIATES, PC - AIA <br /> <br />Bruce B. Bader, AIA <br /> <br />BBB/mjc <br /> <br /> ..... ' "' <br />MARION COUNTY <br />BUILDING INSPECTION <br /> <br />John S I~urli¢lgharn, A ! A <br />Steven J Kotberg, A.[ A <br /> <br /> <br />