My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1264749
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Old Files 2
>
Permit - 1264749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2011 1:50:47 PM
Creation date
9/2/2003 1:31:09 PM
Metadata
Fields
Template:
Permits
Permit Address
20167 GRIM RD NE
Permit City
Aurora
Parcel Number
041W22B 01800
Permit Type
Permit
Extra Information
Publicly Owned
Permit Site Number
North Marion Sch
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~H MARION HIGH SCHOOL <br /> <br />MODIFIED 8I'I-UMEN ROOFING <br /> <br />3.88 <br /> <br /> A. <br /> <br />Contractor is to make all repairs and replacements <br />necessary to insure compliance with the provisions of <br />these specifications. ...~. <br /> <br />Contractor shall make all test cuts~ patching and required <br />repairs and replacements in the presence of the Consultant <br />and/or School District to the satisfaction of and at no <br />additional cost to the School District. <br /> <br />Two Year Rei~pertion (Owner's option) <br /> <br />Prior to the expiration of the Contractor's portion of the <br />two Year guarantee~ an inspection shall be made by the <br />Contractor, School District's Representative, and the <br />Consultant to determine if the roof is in sound condition <br />and if it appears that the roof will last for its <br />specified life. <br /> <br />Any damage noted at this inspection <br />the Contractor~ at his expense~ under <br />School District's Representative and <br /> <br />shall be repaired by <br />the direction of the <br />the Consultant. <br /> <br />The Contractor shall set the date of inspection within the <br />last month of his guarantee period and notify those <br />concerned of the meeting. Should the Contractor fail to <br />arrange the inspection within the two year guarantee <br />period or should the weather preclude inspection at that <br />time, the guarantee shall be extended until such <br />inspection is made and the condition of the roofing <br />approved, The Contractor shall repair all damages except <br />those caused solely by use of the roof or Acts of God <br />which are limited to major earthquakes, lightning or fire. <br /> <br />$7514 - 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.