Laserfiche WebLink
July 1~ 1985 <br /> <br />ELECTRICAL, PLUMBING, AND MECHANICAL <br /> <br /> CHECK SHEET <br /> <br />ELECTRICAL PERMIT <br /> <br />NO RESIDENTIAL <br />__ Residence wiring less than 1000 sq,, ft ................................. {~ $ 30.00 <br />Residence wiring less than 2000 scl, ft ...................................... @ $' 5000 <br />.... Residence wiring over 2000 sS, ft ............................................ @ $ 70,,00 <br />__ Electric heat installation in existing residence ............................. ~ $ 20,00 <br />sERvicES <br />Temporary Construction Service ......................................... @ $ 2000 <br />__ Service change only in an existing residence ................................ @ $ 20.00 ,,. <br />CommerCial or Industrial: <br />__ Service not over 100 amperes ............................................... ~ $ 30.00 <br />__ Service over 100 amperes but not more than 200 amperes ............. @ $ 50,00 <br />Service over 200 amperes but not mote than 400 amperes ; ............. @ $ 70,00 <br />__ Service over 400 amperes but not more than 600 amperes ~ ........ @ $ 100,00 <br />__ Service over 600 amperes @ $ 13000 <br /> <br /> _ Service over 600 volts @ $ 300.00 <br /> COMMERCIAL AND INDUSTRIAL EEEDER$ <br /> Installation of Alterations or Relocation of Distribution Feeders: <br /> ,, Not more than 100 amperes .................................... @ $ 20,00 <br /> _ Over 100 amperes but not more than 200 amperes ..................... @ $ 30.00 <br /> <br /> __ Over 200 amperes but not more than 400 amperes @ $ 5000 <br /> __ Over 400 amperes @ $ 60.00 <br /> __ Feeder over 600 volts @ $ 80.00 <br /> MISCELLANEOUS <br /> \ A Each trailer or mobile home space (Serwce equipment) ................ ~ $ 20,00 <br /> [ B Each supply for mobile home (Connectioni ............................. @ $ 20,00 <br /> __ C Each irrigation pump (Aea¢~ a map showing ~oc,3tlon) @ $ 2000 <br /> __ O Each electric sign or outline lighting .................................. @ $ 2000 <br /> __ E. Each residential swimmmg pool .............................. @ $ 20.00 <br /> BRANCH CIRCUITS <br /> __ One new circuit; alteration or extension .................. ~ $ 15.00 <br /> <br />,, Two or more new curcuits; alterations or extensions ............ ~ $ 20.00 <br /> Other (as per NEC and 8uildleg Official) <br /> FEE <br /> 4% <br /> PLAN REVIEW FEE <br /> iNVESTIGATION FEE <br /> FLEET SURCHARGE <br /> TOTAL <br /> <br />~, O0 <br /> <br /> <br />