Laserfiche WebLink
20. <br /> <br />21. <br /> <br />Porches, ha'loonies or raised <br />floor surfaces located more <br />than 30 in. above the floor or <br />grade shall have guardrails not <br />less than 36 in. in ht.'~ <br />Required guardrails shall have <br />intermediate rails or ornamen~ <br />tal closures which will not <br />allow passage of an object 6 <br />in. or more in diameter. R~ <br />214.2 <br /> <br />Smoke detectors shall be <br />znstalled outside of each <br />separate sleeping area in the <br />immediate vicinity of the <br />bedrooms and on each additional <br />story of the dwelling including <br />basements. In dwelling units <br />with split levels, a smoke <br />detector need be installed only <br />on the upper level, provided <br />the lower level is less than <br />one full story below the upper <br />level, except that if there is <br />a door between levels then a <br />detector is required on each <br />level. All detectors shall be <br />connected to ~ sounding device <br />or other detectors to provide, <br />when actuated, an alarm which <br />will be audible in all sleeping <br />areas. R-215.l <br /> <br />22. <br /> <br />23. <br /> <br />In new construction, required <br />smoke detectors shall receive <br />their primary power from the <br />building wiring. Smoke detec- <br />tors may be battery operated <br />when installed in existing <br />buildings. R-215.2 <br /> <br />Firestopping shall be provided <br />in the following locations: in <br />concealed spaces of stud walls <br />at the ceiling, floors,soffits, <br />drop ceilings, between stair <br />stringers and at openings <br />around vents, pipes, ducts, <br />chimneys and fireplaces at <br />ceiling and floor spaces. R- <br />402.7 <br /> <br />24. <br /> <br />Foundation cripple walls shall <br />be framed of studs with a min. <br />length of 14 in. or shall be <br />framed of solid blocking. R- <br />402.9 <br /> <br />25. <br /> <br />The area within the foundation <br />walls shall .have all vegeta- <br />tion, top soil and foreign <br />material removed. R-603.2 <br /> <br />26. <br /> <br />Rafters shai~l be nailed to <br />ceiling joists tQ: form a con- <br />tinuous tie between exterior <br />walls where: joist~are parallel <br />to the rafters.~Where not <br />parallel, rafters shall be tied <br />with a rafter tie, located at <br />or near the plate~ as practical. <br />Rafter ties shall be spaced not <br />more than 4 feet on center. <br /> <br />27. Ridge board shall be at least 1 <br /> ir~ch nominal thickness and not <br /> <br />less in depth than the cut end <br />of the rafter. At all valleys <br />and hips there shall be a <br />valley or hip rafter not less <br />· than 2 in. nominal thzckness <br />and not less in depth than the <br />cut end of the rafter. R-702.2 <br /> <br />28.~ <br /> <br />29. <br /> <br />When the roof pitch is less <br />than 3 in 12, members support- <br />ing rafters and ceiling joist, <br />such as ridge beams, hips and <br />valleys, shall be deszgned as <br />beams. R-702.3 <br /> <br />Wood trusses shall be deslgned <br />in accordance with approved <br />engineering practice. Trusses <br />shall be braced according to <br />their appropriate engineered <br />design. Truss members shall <br />not be cut or altered unless <br />so designed. R-702.9 <br /> <br />30. Ail plywood, when designed to <br /> b~ exposed in outdoor applica- <br /> tions shall be of an exterior <br /> type, except that plywood roof <br /> . ~. 's-heathing exposed to the <br /> underside may be of interior <br /> t~p~ ~with exterior glue. R- <br /> ::' ~7,03.l , <br /> <br />31~ ~ ~ovide screened attic vents <br /> with a net free area of 1/150 <br /> of the attic area (or 1/300 if <br /> half is along eaves and the <br /> other half in the upper <br /> portion). R-707 <br /> <br />32. <br /> <br />33. <br /> <br />A readily accessible attic <br />access framed opening not less <br />than 22 in. by 30 in. shall be <br />provided. R-708 <br /> <br />Fireplace and chimney con- <br />struction shall conform to <br />chapter 9. <br /> <br />~NSULATION REQUIREMENTS: <br />Buildings with high-efficiency <br />heating equipment shall be <br />insulated as follow: ceiling <br />R-30 (roof/ceiling assemblies <br />in which has a slope of 3 in <br />."~ :.12: or'greater, may be R-19), <br />~ .,'.:~.'w'alls R-il, u~derfloors R-19, <br />: 1!?-' '...;other heating systems, ceiling <br />R-38 (vaulted ceiling R-19) <br />walls R-19 and under floor R- <br />~',: 19. <br /> <br />Elements ~of appliances which <br />create a glow, spark or flame <br />shall be located a min. of 18 <br />in. above garage floor. <br />1114 <br /> <br />Appliances subject to mechani~ <br />cal damage shall be guarded by <br />a protective barrier. M-1114 <br /> <br /> <br />