My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1276766
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
92-XXXXX
>
Permit - 1276766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2011 2:54:04 PM
Creation date
9/3/2003 12:35:36 PM
Metadata
Fields
Template:
Permits
Permit Address
8342 BISHOP RD SE
Permit City
Aumsville
Permit Number
92-00630
Permit Type
Permit
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATION OF FLEXIBLE MEMBRANE LINER 'INSTALLATION <br /> <br />PERMIT NO. <br /> <br />Completed liner installations shall be visually checked for <br />punctures, rips, tears and s~am discontinuities before placement <br />of any material or backfill. The installer is required to <br />manually check all factory and field seams. In lieu of or in <br />addition to a manual check, ~ither one of the following tests can <br />be performed. This form is required to be filled out completely, <br />signed and submitted by the i, nstaller as verification that the <br />liner evaluation and/or testing has been done. <br /> <br />I have visually checked the liner for punctures, rips, tears and <br />seam discontinuities and hav.~ manually checked all factory and <br />field seams. <br /> <br />~/have not (circle one) performed one or more of the <br />following liner tests: <br /> <br />[ ] WET TEST: <br /> <br />The ii.ned basin was flooded with water to <br />a fou,.' (4) foot level and the leakage rate <br />over :~ 24 hour period was no greater than <br />0.25 inches. <br /> <br />AIR LANCE TEST: <br /> <br />Ail s,:~ams (factory and field) were <br />inspe~ted for unbonded areas using an air <br />nozzle device with a minimum 50 PSI air <br />suppl? through a 3/16 inch nozzle held not <br />more ;;hah 2 inches from the seam edge. <br /> <br />I certify that this flexible membrane liner and the installation <br />meets all requirements of 0A~ 340-73~085. <br /> <br />~Liner Manufacturer: ........ ., <br /> <br />Installer Signature Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.