My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1276890
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Old Files 5
>
Permit - 1276890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2011 3:45:49 PM
Creation date
9/3/2003 12:38:21 PM
Metadata
Fields
Template:
Permits
Permit Address
9978 STAYTON RD SE
Permit City
Aumsville
Permit Type
Permit
Permit Site Number
14869
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(503} 588-$038 <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMENT <br /> <br />DAVID BUTLER <br />9978 STAYTON ROAD SE <br />AUMSVILLE, OREGON 97325 <br /> <br />SUBJ: <br /> <br />SEPTIC SYSTEM REPLACEMENT REVIEW <br />T.9S., R.1W., SECTION 18 <br />SITE # 14869, APPLICATION # 9036804 <br /> <br />I stopped by thi~ property and examined the three soil <br />test pits that you prepared. While the soil conditions <br />appear suitable to consider that area for the new septic <br />system, I am not sure that there is enough space to site <br />the new house and the required amount of drainfield. <br /> <br />A field ~take out should verify whether the necessary 375 <br />lineal feet of drainfield can be constructed and meet the <br />minimum separation distances from proposed and existing <br />features. Refer to the enclosed stakeout procedure and <br />the setback list in choosing the site for the individual <br />drainfield lines. Note in particular, the 100 feet set- <br />back from wells, the 10 feet from the house and property <br />lines and the 25 feet setback from the bluff/escarpment <br />line. <br /> <br />When you have accurately staked the proposed construction <br />develop a to-scale-drawn plot plan of the stakeout and <br />submit it to our office for review. We will make a return <br />visit to the property to ensure all setbacks are in com- <br />pliance to issue the permit. Call, if you have any ques- <br />tions. I am usually in the office between 8 and 10 AM. <br /> <br />LEE A. GRIMES <br />SOIL SCIENTIST <br /> <br />DON WOODLEY <br />BUILDING OFFICIAL <br /> <br />Senator Building 220 High Street NE Salem, Oregon 97301-367() <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.