Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br /> <br />220 fiigh Sweet NE <br />Sal~m, Oregon 9730 <br /> <br /> vo . O%¢E useI <br /> RecelYed by: <br /> Date: <br /> <br /> Code.n-~ho~ KO <br />I M~CHANICAL PERMIT APPLICATION ~ ~=sss'?~'s Date: <br /> P/ease complete all Sections~ I through 5 ~P ~ ~ ~: i~ued <br /> <br /> 1. LOCATION OF INSTALLATION <br /> <br />City Cross <br /> <br />RESIDENTIAL [] COlVI~RCIAL <br /> <br />Directions <br /> <br />pERMITS AIL~ NON.TRANSFERABLE AND NON-R,EFL~DABLE AND <br />EX?IKE iF WORK. IS NOT STAKTI~D WITHIN IS0 DAYS OF IS~UAlqCE <br />O~. IF WORK IS SUSPENDED FOP. 180 DAYS, <br /> <br />lA. CONTIIACTOR INSTALLATION ONLY <br /> <br />FOR OWNER INSTALLATIONS <br /> <br />Mailing Addo:s~ ~ <br /> <br />Thc installation is being made on properly I own which is not intended for sal~, <br /> <br />We will provide plan review service if you complete Section <br />5B and submit two (2) ~ets of plans and specifications with <br />this application. <br /> <br />This optional plan review program does not suspend the <br />required submission of plans, and specifications when required <br />by the Oregon Stmeteral Specialty Code, Chapter 53, <br /> <br />Forced Air l%mace $ 6.00 <br />100,000 BTU o~ teas <br />Over 100,000 BTU -- $ 7,50 <br /> <br />Floor Furnace $ 6.00 <br />Suspended Heater --. $ 6.00 <br />Wall Hea~er ~ $6,00 <br />Floor Moun~d Unit Heater __ $6.00 <br /> <br />Heat Pump or Air Conditioner <br />Up to 3 Toa $ 6.00 ..... <br />3 Ton to 15 Ton $ I 1.00 <br />l~vaporative Cooler $ 4.50 <br />'gxhaust System, Commercial $ 4.50 <br />Hood aud Exhaust, Commerolal __ $ 4.50 <br /> <br />Domestic Rang~ Hood __ $ 4,50 <br />Domestic Exhaust Fans <br />and Dryer Ve~tts __ $ 3~00 <br />Fire Damper __ $ 3.00 <br />Wood Stove __ $ 7.50 <br />Furnace Ducts (Alteration, Extension) __ $ 7,50 <br /> <br />Commercial or Industrial Incinerator __ $30.00 <br /> <br />Gas Water Heater (relocation <br />or replacemeut) $ 7.50 <br />Ga~ Connectiou w/o Applianea <br />--l~r outlek up to 4 __ $ ZOO <br />--over 4, $8.00 plus ea. <br />additional $ .50 <br /> <br />For ~e Installation, Relocation <br /> or Reglacem~t of es, Appl~e <br /> Vent not ~luded ~ ~ <br /> A~li~ea ~it. <br /> <br />Other (as required by Building OfficiaZ) <br /> <br />J3Z41 " <br />2/92 <br /> <br />__ $ 3,00 <br /> <br />FEES i...~ a_~' <br /> TOTAL AMOUNT DU~ $ <br /> <br /> <br />