Laserfiche WebLink
Application <br /> <br />For beg results wid~ Ihe Glued <br />Floor System, follow Ibese <br />applicgtion procedures; <br /> <br />1) <br /> <br />Snap a chall,' line acrOSS joists <br />haut feet in from wall f`ar <br />plywood panel edge alignment <br />and as a botmdary [,ar spreading <br />glue. <br /> <br />2) <br /> <br />Spread only enough gluu to lay <br /> <br />follow specific reconlJllendations <br />o[ glue nl~lnLdacturel-, Wipe any <br />mud, dirL or water [rom jo;sts <br />before gluing. <br /> <br />3) <br /> <br />Lay first panel with tongae side <br />to wall and nail [n place, This <br />protects the tongue of next <br />panel from damage when tapped <br />into place with block and sledge- <br /> <br />4) Apply a continuous llne o( glue <br /> (about 1/4 inch diameter) to sill <br /> and framing members, Apply <br /> glue in ~ serpentine pattern <br /> oil wide grogs, <br /> <br />5) Apply two lilies of glue cart <br /> joists where panel ends butt to <br /> assure proper giulng of <br /> each end. <br /> <br />6) After first row of panels is in <br /> place, spread glue in groove of <br /> One or two panels at a time <br /> fore layieg next row, Glue line <br /> may be continuotJs or spaced, <br /> but avoid squeeze-out by ap- <br /> plying a thinner line than on <br /> joists, <br /> <br />7) Tap second-row panels into <br /> <br />8) Stagger end joints [n each suc- <br /> ceeding row, leaving 1/16 inch <br /> hetween all end joints and 3/32 <br /> inch (1/16 inch for 1-1/~-inch <br /> panels) at T&G edges. (Use a <br /> <br /> 9) Complete ail nailing of each <br /> <br /> · dng,) Use 6d defornled.,shank <br /> <br />'12 inches on all bearings, (See 1able 1 <br />for 2.4.1 nailing schedule,) Closer <br />nail spacing r0ay be required by <br />some c:ocles, or R)r diaphragm <br />construction, When floor <br /> <br />[gSleners are flush with or below <br />[[oor surface just prior lo <br />installation of Ihir~ floor cover- <br />ings such as tile, linoleum or <br /> <br />vinyl, Fasteners sJ'loLt]d be se[ if <br />1;reen b-aming will present nail <br />popping I)rolfl('ms upon drying. <br />Do riel fill nail holes, ThorougMy <br /> <br />larly at joints and around nails, <br /> <br />Table 2 --APA Glued Floor System <br /> Maximum Joist Spans with Sturd-I-F]oor Panels(~x2) <br /> <br /> r JOiSts 16, o.c. , ..... JOiSts,i§.2,, o.o. JOiSts 24:, o.o, <br />Species and Joist 19/~2'7- 23/32" ' 19/32" 23/32" 23/32" <br />Grade of Joist Size <br /> SturCl-I-FisorSturd-I.FIoor Sturd-l,t'isorSturd:l.Roor StuT,d-l,Floor <br />Douglas fir- 2x8 14-8 14-7 13-7 13-10 12-5 <br />Larch NO, 1 ~xl0 17-11 18-3 17-0 17-4 15-10 <br /> 2x6 10-6 10.6 9-7 9-7 8-7 <br />Douglas fir- 2x8 lg-10 13-10 12-7 12-7 11-3 <br />Larch NO. ~ 2x10 17-7 17-7 16-1 16-1 14-5 <br />Doug as fir. 2×8 13-4 13-8 12-8 13-0 12-0 <br />Soud~ No. 1 2x10 16.8 17-0 15-11 16.3 15-4 <br />Dougias fir- 2x8 13.t 13-4 12-~ 12-2 10-10 <br />South No. 2 2x10 16-4 16-8 16-6 15-6 13-10 <br /> <br /> 2x6 ..... 10-3 10-3 9-5 9-5 <br />He¢l. Fir No. I 2x10 17-0 17-4 15-10 15-10 14-2 <br /> 2~t2 20-6 20-10, 19-3 .... 19-3 17-2 <br /> 2~ 9-4 9.4 8-6 8-6 7-7 <br />Hem-Fir No. 2 2xlO 15-8 16-8 14,4 14-4 12-10 <br /> 2x6 9-6 9-6 8-8 8.8 7-9 <br />Hemlock NO. 2 2x10 15-8 16.0 14-8 14-8 13.1 <br /> 2x6 ' 9-4 0-4 8-6 8.6 7.7 <br />Hemlock-Hem 2x10 15,8 15-8 14-4 14.4 12-10 <br />WestcrnHemlock 2x8 13-10 14-1 13-0 13.0 11-8 <br />NO. 1 2x10 17-4 17-8 16-6 16-7 14-10 <br /> 2x6 8-1 I 8-11 8-2 8-2 7.2 <br />No. 2 2xlg 15-0 15-0 1~.8 13-8 12-3 <br /> 2x6 8-11 8-11 8-2 8.2 7-6 <br />Western Cedar 2x8 11-9 11-9 10-9 10-9 9-7 <br />NO, 2 2x10 15-0 15-0 13-8 13-8 12-3 <br />Soutkern Pine 2x8 14,8 14-7 13-7 13-11 12-9 <br />(KD) No. 1 2x10 17-11 18-3 17-0 17-4 16-8 <br /> <br /> <br />