Laserfiche WebLink
Enclosed please find a revised drawing in which I have hi-lighted <br />the areas which require explanation and am numbering them and <br />listing them below with the corresponding numbers. <br /> <br />3.) <br /> <br />We propose to extend 2.5 - 12' long 3" x 8" headers lengthwise <br />on both ].eft and right side of drawing. These headers will be <br />clipped together where they are joined with hurricane clips on <br />both sides of each header and nailed with Teeco Nails. <br /> <br />Vertical Posts to consist of 10' long 3" X 6" pressnre treated <br />posts. They are to be cemented in ground 2' deed and 2' in <br />diameter. They will be conneced to header underneath with: <br /> SIMPSON ACE LEFT SIFLPSON ACE RIGHT <br /> NER-421 and NER-421 <br />they will be nailed with Teeco nails. Posts will be placed <br />every 8t and another one will be placed where the headers are <br />joined. <br /> <br />Widthwise 2" x 6" will be connected at left side of drawing <br />to header with joyce hangers: SIMPSON <br /> CBO 1258 <br /> U210 <br />These will also be nailed with teeco nails. <br />At right side of drawing the 2" x 6"s are to sit on top of header <br />and to be connected with 16d nails, I on each side and using <br />2" x 6" blocking with 2 - 16d nails at each end. <br />These 2" x 6"s will be placed 24" on centerl <br /> <br />4.) <br /> <br />At front and back of carport there are 2 - 2" x 8" nailed together <br />with 16d nails and lagged together with 3½" lag bolts on <br />both sides. <br /> <br />IF ANY OF THESE CHANGES SHOULD NOT MEET CODE REQUIREMENTS, <br />PLEASE INFORM US WHAT WILL AND WHY AS SOON AS POSSIBLE. <br /> <br /> <br />