Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> <br />DIRECYOR <br /> <br />BUILDING INSPECTION <br />(503) $88-51~7 <br /> <br />PLANNING & <br /> <br />(503) 5~-5038 <br /> <br />Gary Heer <br /> <br />ADMINISTRATIVE <br /> <br />April 12, 1993 <br /> <br />Ridderbush, Robert R Et A1 <br />< Brentano, Gregory <br />19435 Butteville Rd N~ <br />Aurora, Oregon 97002 <br /> <br />Subject: Building Without Proper Permits <br /> Site: 16839, Address~ 19435 Butteville Rd NE <br /> <br />Dear Mr. grentano: <br /> <br />A site inspection was made at the above location on March 16, 1993. <br />At that time a ~arion County Building Inspector posted a notice to <br />contact the Building Inspection Division, and obtain a permit by <br />March 19,1993 for Manufactured ~ome. <br /> <br />Failure to obtain a building permit prior to construction is a <br />violation of Marion County Ordinance No. 881. Efforts to gain <br />compliance have failed, therefore an INVESTIGATION FEE has been <br />assessed in addition to the required permit fees. <br /> <br />Proper permits must be obtained~ or the Unit must be removed no later <br />than April 23, 1993. I have enclosed copies of the required permit <br />application(s) and site plan. You will also need to indicate on the <br />enclosed site plan the distances between the proposed structure and <br />the property lines. Please sign and return with payment. <br /> <br />Failure to comply by this date may result in the issuance of a <br />$100.00 per violation, per day citation and/or possible further <br />enforcement measures. <br /> <br />If there are any questions, please do not hesitate to call. <br />CHIEF BUILDING INSPECTOR <br /> <br />DON WOODLEY <br />BUILDING OFFICIAL <br /> <br />Senator Building 220 High Street NE · Sa[em, Oregon 97301-3670 <br /> <br /> <br />