My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1282560
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
93-XXXXX
>
Permit - 1282560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2011 12:19:36 PM
Creation date
9/3/2003 3:29:22 PM
Metadata
Fields
Template:
Permits
Permit Address
8188 SILVER FALLS HY SE
Permit City
Aumsville
Permit Number
93-02351
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MCBI POLICY/PROCEDURE <br /> <br />section 109 <br /> <br />P~EFIP{D OF APPLICATIONS <br /> <br />Any fee erroneously paid or collected may be refunded. NO refunds aha].] be <br />made for less than $6.00. No fee shall be refunded except upos written <br />request by the original permittee not later than 180 days after ~he date of <br />the fee payment. <br /> <br />I. BUILDING, ELECTRICAL, PLUMBING, & MECHANICAL APPLICATIONS <br /> <br />Permit Application i~ canceled or withdrawn and no plans review <br />has been done. <br /> <br />2. <br />3. <br />4. <br /> <br />80% of the permit fee shall be refunded. <br />Ail of the plans review fee shall be refunded. <br />All of the State Surcharge shall be refunded. <br />Zoning surcharge shall be refunded if the application has <br />not completed zoning review. <br /> <br />Permit Application is canceled or withdrawn after plans have been <br />reviewed, but before permit is issued. <br /> <br />No plans review fee shall be refunded. <br />80% of the permit fee shall be refunded. <br />All of the State Surcharge shall be refunded. <br />NO soning surcharge shall be refunded. <br /> <br />II. SUBSURFACE ON-SITE SEWAGE (OAR CHAPT. 340, 71-140-5) <br /> <br />A. No refund on an application where field work has been done or <br /> other substantial review of the application. <br /> <br />When an application has been canceled Or withdrawn~ before any <br />field work or other substantial review of the application has been <br />completed a refund shall be made of the DEQ surcharge and 60% of <br />the application fee. <br /> <br />No refund on a DEQ surcharge unless the application is canceled <br />within the same month that it is made, as all DEQ surcharges are <br />remitted at the end of each month based on the ~umber of submitted <br />applications for that month. <br /> <br />III. MANUFACTURED STRUCTURES <br /> <br />Per-mit application has been canceled or withdrawn and no review <br />work has been completed: <br /> <br />80% of the permit fee shall be refunded. <br />Ail of the State Surcharge shall be refunded. <br />All zoning surcharge shall be refunded unless zosia~ review <br />wam completed. <br /> <br />B. Permit application has been canceled or withdrawn after review <br /> work completed, but before permit is issued: <br /> 80% of the permit fee shall be refunded. <br /> 2.Ail of the State Surcharge shall be refunded. <br /> 3.NO zoning surcharge shall be refunded. <br /> <br />2/92 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.