Laserfiche WebLink
8 9 0 L <br />January 5, 1995 <br />Page 2 <br /> <br />both sides) that has all ~dqes ~ th4 ~Fpsu~*l)anels blocked. It shall be <br />screwed or nailed off as per code. &dhesive instillation is not <br />allowed, <br /> <br />10. <br /> <br />In scissor trusses loose fill insulation is not allowed when there <br />les~ than 44 inches of headroom and/or the interior,,,c~iling slope <br />exceeds 2 in 12. <br /> <br />11. <br /> <br />Any ceiling is considered vaulted when the ceiling slope is 2/12 or <br />greater. Insulation in a flat ceiling (slope less than 2/12) shall have <br />a minimum rating of R-35. Insulation in vaulted ceilings may have a <br />minimum rating of R-30, for a maximu~...R~ 50% of the total heated floor <br />~.pace area. (oregon Energy Code) <br /> <br />Approval as a result of this plan review or an inspection shall not be <br />construed to be an approval of a violation of the provisions of the dwelling <br />code or of other ordinances of the jurisdiction. Reviews or inspections <br />presuming to give authority to violate or cancel the provisions of the <br />dwelling code or of other ordinances of the jurisdiction shall not be valid. <br /> <br />DAW <br /> <br />"APPROVED" only when this sheet is attached to plans <br /> <br /> <br />