Laserfiche WebLink
' DATE/TIME <br /> PERHIT HO <br /> TYPE <br />...... C~P~55 <br /> <br />MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 * Phone: (503) 588-5147 * 24-HR Inspection Line; (503) 588-7904 <br /> <br /> SIT£ EVALUATiOH APPROVAL <br />; 07/1~/95 11=38 STATUS = APPROVED <br />= 95-~3~22 APPLIED : ~6/16/1995 <br />: SE APPROVEO : ~7/1&/1995 <br />: <br />: R-3 P~I;E 3 <br />'THIS SEPTIC R£VIEW WAS COHPLETED BY L~E A. GRIflES OH JULY <br />~ 1975. THIS IS A RE-EVALUATION TO CON~[~ER THE DRAINFIELOS <br />~ A DZFFEREHT AREA FROM THE ORIGINAL SITE EVALUATION CON- <br /> <br />DUC'I'ED MARCH 14~ 1978. <br />l'he drainf~elds cannot be constrcted within the drainage <br />swale where the test pits are dug. The drainlines mus~ be <br />installed above the u~ermost test pit. See revised site <br />~lan dated duly ?~ 1~. :A pre'construction field stakeout <br />is recommended to establish the locations and elevations of <br /> <br />the individual drainlines prior to any excavation. Refer to <br />the stakeout procedure and the setback list for details to <br />complete 'the stakeout. Allow space ?or an up-slope curtain <br />drain should it prove necessary. The replacement d~'ainf:[eld <br />can be located across ~he swale ~ithin the [[pperMost part of <br />~he Southeastern corner of the property. <br /> <br /> <br />