Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 235 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 588-7904 <br /> <br />CERTIFICATE OF SATISFACTORY CONPLETION <br /> <br />OCCUPANCY = R-3 PA~E I <br /> <br />SITE A~RESS = CITY: AURORA 2~855 WALNUT ST NE AR <br /> <br />PARCEL NUMBER <br />PARCEL SIZE <br /> <br />OWNER <br /> <br />CONTRACTOR <br /> <br />::WORKDESC <br /> <br />NEW COLONY PARK <br /> <br />9~190-12~ <br /> <br /> 5~B~.0 SF <br /> <br />MANNI~RO~ERT A ~I & BONA C <br />HANNI II~ ROBERT & ~OHA <br /> <br />NJR RPR=~F ENER~ENCY <br /> <br /> LOT:12 BLOCK: <br /> <br />PROPERTY LOCATOR= 041W13CAB47~O <br /> <br />LICENSE: <br />OCC~ <br /> <br />~ROjECTE9 bAILY SEWAGE FLOW= 375 gALLONS <br /> <br /> PERHIT SYSTEN TYPE= SEEPAGE TRENCH <br /> <br />The septic system located at the above addEiess has b~en ins~e~e~ and found . <br />the conditions of the per,it. This CERTIFICATE OF S~T[SFACTORY COMPLETION is <br />issued as evidence tha~ the system complies;with the rules. The Certificate is <br /> <br />?er ~nicn i~ was co~struc~ed. <br /> <br />See attached As-~ilt dra~i~ for details of the constructed system. <br /> <br />DONALD E. WOODLEY~ MARION COUNTY BUILDING OFFICIAL / BY TNEAL <br /> <br /> <br />