Laserfiche WebLink
WORK LIST <br /> <br />I, Delay site <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />I%mish a 1500 gallon, two-compartment septic tank and install in area shown on <br />the drawing. <br /> <br />Locate ex/sting drainfield and connect new septic tank to drainfield, using 4-in. <br />Sch. 40 (ASTM D3034) solid sewer pipe. <br /> <br />Relocate water serviceline if and as necessa~7. <br /> <br />Replumb under-house sewer piping to com~ect to new septic tank. <br /> <br />Install ¢leanout. <br /> <br />Abandon existing septic tank per DEQ requirements. <br /> <br />U,S. Puhllc Health ,gervice <br /> <br /> ($4}3) 326-2001 <br />FAX (5413) 326-728{I <br /> <br />DAVE llUNT <br />Engineering Technician <br /> <br />Portland Area <br />h~dian Health Scow(ce <br />1221} SW 3rd Avenue, Rm, 476 <br />Portland, Ore~on 972414 <br /> <br />MARION COUNTY <br />BUILDING INSPECTION <br /> <br /> <br />