Laserfiche WebLink
MARION COUNI~f BUILDING INSPECTION <br /> COMMUNITY DEVELOPMENT CENTER <br /> <br /> 255 Church Street NE - Room 132 · Salem, Oregon 97301-367Q <br />Office Hours: 8:00-4:30 · Phone: (503) 558-5147 · 24-HR inspection Line: (503) 373-4427 <br /> <br />CERTIFICATE OF SATISFACTORY COMPLETION <br /> <br />BATE/TIME : 86/18/96 12:52 STATUS : COFC <br />PERMIT NO : 9§-17830 ISSUED : B1/24/1976 <br />OCCUPANCY : R-~ PAGE <br /> <br />S);TE ADDRESS : CITY: DETROIT t2e SHORT ST ~T <br /> <br />SUBDIVISION : LOT: BLOCK: <br /> <br />PARCEL NUMBER : 67014~88g <br /> <br />PROPERTY LOCATOR: 18§E~2AB091~8 <br /> <br />PARCEL SIZE : .OAC <br /> <br />OWNER <br /> <br />~ENSON~ H D & SHIRLEY E <br />PO BOX 245 <br />SUBLIMITY, OR <br /> 97~85 <br /> <br />APPLICANT <br /> A~RESS <br /> <br />INSTALLER <br /> ADDRESS <br /> <br />WORK BESC <br /> <br />~ENSOM, H ~ & SHIRLEY E <br />PO BOX 245 <br />SUBLIMITY, OR <br /> 97385 <br /> <br />DENSON, H B & SHIRLEY E <br />PO BOX 245 <br />SUBLIMITY, OR <br /> 97385 <br /> <br />DRAINFIELD REPAIR-SEEPAGE TRENO <br /> <br />BEQ LICENSE: <br /> <br />PROJECTED DAILY SEWAGE FLOW: 3)B GALLONS <br /> <br />PERMIT ~YSTEM TYPE: <br /> <br />The sestic system located at th~ above add[ess has b~en inspected and found <br />to be iq compliance ~th the rules of ~he ~nvironmen=al Quali~y Co~mission arid <br />the cono[tions of the permit. This CERTIFICATE/OF SA~I~IFACTOR¥ COMPLETION is <br />issued as evidence that the system complies ~ithjthe rules. The Certificate is <br />valid for a period of five (5) years for connection of the sys~e~ to the facility <br />for ~hich it ~a~ constructed. <br /> <br />See attached As-Built dTamin§ for details of the:constructed syste~. <br /> <br />DONALD E. WOOBLEY, ~ARION COUNTY BUIL9ING OFFICIAL / BY BFREILI~ <br /> <br /> <br />