Laserfiche WebLink
carpet to allow the membrane to fully contact desired, and where reinforced concrete <br /> the primed substrate. Seal all T-joints and slabs are placed over the membrane,the use <br /> membrane terminations with Bituthene of in.(6 rum)hardboard or 2 layers of <br /> Liquid Membrane at the end of the day. '/8 in. (3 mm)hardboard is recommended. <br /> Protrusions and Drains • Cover any exposed Bituthene membranes <br /> Apply membrane to within I in. (25 mm)of with weather resistant flashing such as <br /> the base of the protrusion.Apply Bituthene copper,aluminum or neoprene. Install <br /> Liquid Membrane 0.1 in. (2.5 mm)thick protection the same day the membrane is <br /> around protrusion. Bituthene Liquid applied or immediately after 24 hour flood <br /> Membrane should extend over the membrane testing. No waiting before backfill or appti- <br /> a minimum of 2s1/ in. (65 mm)and up the cation of wearing course is necessary. <br /> penetration to just below the finished height Insulation <br /> of the wearing course. <br /> Flood Testing Always apply Bituthene membrane directly to <br /> Flood test all horizontal applications with a primed or conditioned structural substrates. <br /> minimum 2 in. (51 mm)head of water for Insulation, if used,must be applied over the <br /> 24 hours.Mark any leaks and repair when the membrane. Do not apply Bituthene membranes <br /> membrane is dry. Before flood testing,be sure over lightweight insulating concrete. <br /> the structure will withstand the dead load of Approvals <br /> the water.For well-sloped decks,segment the • City of Los Angeles Research Report <br /> flood test to avoid deep water near drains. RR 24386 <br /> Conduct the flood test 24 hours after complet- • U.S.Department of housing and Urban <br /> ing the application of Bituthene waterproofing Development(HUD)HUD Materials <br /> system. Immediately after flood test is Release 628E <br /> completed, and all necessary repairs made, • Bituthene System 4000 Membrane carries <br /> install Hydroduct'660 Drainage Composite an Underwriters'Laboratory Class A Fire <br /> to protect the Bituthene membrane from <br /> traffic and other trades. Rating(Building Materials Directory, File <br /> 41111W4R7910)when used in either of the follow- <br /> Membrane Repairs ing constructions: <br /> Patch tears and inadequately lapped seams —Limited to noncombustible decks at <br /> with membrane. Clean membrane with a <br /> damp cloth and dry. Slit fishmouths and repair inclines not exceeding '/4 in. (6 mm)to <br /> with a patch extending 6 in. (150 mm)in all the horizontal 1 ft(0.3 m). One layer of <br /> directions from the slit and seal edges of the Bituthene waterproofing membrane, <br /> patch with Bituthene Liquid Membrane. followed by one layer of Asia (3 mm) <br /> Inspect the membrane thoroughly before protection board,encased in 2 in. (50 mm) <br /> covering and make any repairs. minimum concrete monolithic pout <br /> —Limited to noncombustible decks at <br /> Drainage inclines not exceeding 1/4 in. (6 mm)to <br /> Hydroduct drainage composites are recom- the horizontal 1 ft(0.3 m). One layer of <br /> mended for both active drainage and Bituthene waterproofing membrane, <br /> protection of the membrane. See Hydroduct followed by one layer of DOW Styro- <br /> product information sheets. foam PD Insulation Board [2 in. (50 mm) <br /> Protection of Membrane thick].This is covered with one layer of <br /> 2 ftx 2 ft x 2 in.(0.6 m x 0.6 mx 50 mm) <br /> Protect Bituthene membranes to avoid concrete paver topping. <br /> damage from other trades,construction mate- <br /> rials or finishes. Place protection immediately Warranty <br /> in temperatures above 77°F(25°C)to avoid Five year material warranties covering <br /> potential for blisters. Bituthene and Hydroduct products are avail- <br /> • On horizontal applications,exposed to able upon request. Contact your Grace sales <br /> construction traffic, use Hydroduct 660 representative for details. <br /> Drainage Composite.Adhere as necessary Technical Services <br /> to membrane with Hydroduct Tape.Alter- <br /> nate methods of protection are to use s/8 in. Support is provided by full time,technically <br /> (3 mm)or '/4 in. (6 mm)asphalt hardboard. trained Grace representatives and technical <br /> In mud slab waterproofing,or other appli- <br /> research and development staff <br /> service personnel,backed by a central <br /> cations where positive drainage is not <br />