My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12986339
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
10-XXXXX
>
12986339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:00:10 PM
Creation date
7/30/2025 10:02:02 AM
Metadata
Fields
Template:
Permits
Permit Address
53000 BREITENBUSH RD SE
Permit City
Detroit
Permit Number
555-10-03775
Parcel Number
097E20A 00300
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Breitenbush Reservoir <br /> Alternate Material(s) and/or Method(s)Application <br /> klur <br /> We believe the following documentation demonstrates and indeed exceeds equivalency, <br /> meeting both the letter and the spirit of NFPA 22. Once this tank is built, Breitenbush Hot <br /> Springs(BHS)will be better able to support public health and safety by providing <br /> sufficient storage of clean drinking water, at the same time providing adequate fire <br /> protection for the Lodge and overall facility. <br /> We rely upon the assurance given us in NFPA 22 Section 1.2 Purpose, "...Nothing in <br /> this standard shall prevent the use of systems, methods, or devices that are equivalent in <br /> quality, strength, fire resistance, effectiveness, and durability to those prescribed by this <br /> standard, provided technical documentation is made available to the authority having <br /> jurisdiction that demonstrates equivalency, and the system, method, or device is <br /> appropriate for the intended purpose." <br /> Troy Wheeler, in his email to BHS of July 8, 2011,outlined the following tasks: <br /> For the alternate means and method, include: <br /> 1. Documentation on the size of the tank <br /> 2. Amount of water in tank compared to the sprinkler requirement <br /> 3. Means of low-level alarm/notification <br /> 4. Percentage of the water supply that is used daily and how it is replenished <br /> 5. Refill method that is capable of keeping the tank full enough for the amount of <br /> ihe fire protection water <br /> 6. Any other means that supports Warren's decision to determine that this would <br /> be a reliable water source <br /> 7. State the differences in your design and NFPA 22 requirements <br /> Overview: <br /> As we understand it,the final point to successfully address in order to receive a permit to <br /> commence building the reservoir is the following section of NFPA 22, Standard for <br /> Water Tanks for Private Fire Protection,2008 Edition: <br /> "Section 14.7.2: Pipe for Other Than Fire Protection Purposes <br /> Section 14.7.2.1: Pipe used for other than fire protection purposes shall be entirely <br /> separate from fire-service pipes and shall extend to an elevation inside the tank below <br /> which an adequate quantity of water is constantly available for fire protection." <br /> Breitenbush's proposed reservoir is composed of two cells with a combined total capacity <br /> of 184,726 gallons. In this plan, Cell #2 receives water first. The outlet pipe in this cell is <br /> a dedicated fire-service pipe connected directly to the Lodge sprinkler system. Only after <br /> Cell#2 (which holds 92,363 gallons) becomes full is water delivered(via a pour-over, or <br /> waterfall system) to Cell#1, an adjacent 92,363 gallon tank with an outlet pipe that <br /> supplies potable water to the domestic drinking water system(see schematic, Breitenbush <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.