Laserfiche WebLink
EX4991 March 2,2007 <br /> ( 06NK23629 <br /> Test I Sprinkler OpeMlon Saeuenw <br /> Tyco Ory Pipe Test <br /> CM-40 a.Storage,48 ft.Ceifiy <br /> N 16.8,286•F bulb <br /> 30 <br /> 25 <br /> ore 20 -- .—. <br /> 115 <br /> Sy <br /> i 10 _. <br /> 4 <br /> 0 <br /> 0 50 100 150 23 250 300 350 400 450 <br /> Time from FIM Activ3iIon IaecpYs) <br /> 41111 Figure 15.Test!Sprinkler Operation Sequence <br /> 3.1.5. Linear Heat Detector Activation <br /> Eight branch lines were instrumented with linear heat detector wire located below the <br /> pipe(see Figure 10). The activation times for each beat detector wire can be seen below <br /> in Figure 16. <br /> L <br /> 15 <br />