My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12988112
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
16-XXXXXX
>
12988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 8:00:12 PM
Creation date
7/31/2025 9:02:23 AM
Metadata
Fields
Template:
Permits
Permit Address
2630 N PACIFIC HWY
Permit City
Woodburn
Permit Number
555-16-000845-STR
Parcel Number
051W09 00100
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br /> I am a little confused on the roof construction proposal.In one detail it shows complete roof assembly and then <br /> detail talks about open air roof.Can you please clarify. <br /> (le,,)2 a pia roc <br /> Thank You, <br /> �--q JJ�� (a uato <br /> ND flow• (.rr ec� <br /> cL <br /> Chris Trussell <br /> Marion inspector/ <br /> or/Plan Examiner <br /> er C1�l Ini <br /> r� <br /> Building [nspectpr/Plans Exam'mer IJY>. JQ (�J•� �3 3 7D 9.05,r- <br /> Fax Pho n503-058879 8977 a\iozo. oc 1cowl letzei <br /> sLei leica <br /> 4 pfecF5,on. <br /> >> "Larson, Kent <klarsonfi DLRGROUP.com> 3/3/2017 1:59 PM >>> fir/ <br /> Chris, <br /> Attached please find Alternate Method Application for the East Campus Housing skylights. <br /> For comparison to our proposed alternate method we propose a code path method of a lumber/plywood <br /> sheathing/shingle construction roof infill over the remainder of the rec yard area. This would be engineered of <br /> course,with sprinkler system. This would be allowed for the Type VB construction and based on our discussions <br /> meet the written requirements of the code. <br /> Our proposed alternate method is the currently designed configuration of the skylight system. As the application <br /> form states, the provisions of the code are not intended to prevent a method of construction not specifically <br /> prescribed by the code. We offer that the alternate method is, in our professional opinion, equivalent in all <br /> respects regarding safety of the building occupants, which is what we all care about. We do not see any aspects of <br /> the alternate method that are less safe than the intent of the code. <br /> We submit this will all due respect and wish to formally request the alternate method we have discussed verbally. <br /> We believe on all counts that the alternate method is more safe and effective and meeting the intent of the code <br /> including limited area for the plastic skylight(coverage issue), minimizing risk to maintenance staff on the roof <br /> (curb issue), and limiting the amount of combustible materials and overhead structure overall (fuel load and <br /> overhead structure).- <br /> We respectfully request consideration of the alternate method request. <br /> Please let me know if you have any questions. <br /> Kent R. Larson,AIA, LEED AP <br /> Architect ( Principal <br /> klarson(adlrgroup.com<mailto:klarsonadl rgrouo.nom> <br /> DLR Group <br /> Architecture Engineering Planning Interiors <br /> o:503-274-2675 ) d: 503-200-3303 ) m:503-341-8455 <br /> 421 SW Sixth Avenue,Suite 1212 Portland, OR 97204-1613 <br /> Find us at: tilrgroup:com<httpl/www.dlrgrou¢com/> ) Facebook<htto//www.facebook com/dlrgroup/> j <br /> Twifter<htto.//www.twittercom/dIrorouo» <br /> ♦/ Westlake Reed Leskosky Joins DLR Group! Click for more details. <br /> <http://www-diroro up.coin/about/news/westlake-reed-leskosky-to-iiof n-dlr-croup/> <br /> fi le_///C:/Users/TRfheeler/AooData/Local/Temn/XPRmwise/58BDDOB4GIV1 4]M_MAR/1_. 3/13/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.