Laserfiche WebLink
• •LOW AND STANDARD SLOPE THE 7-COURSE,S'STEPPED-OFF DIAGONAL METHOD <br /> Use FOUR nails for every fidl shingle located as shown below. Important Do not align end jousts of a given course closer than 5" <br /> (127 mm)from one another.End joints must be at least 3'(16 mm) <br /> from the nails on the underlying course. <br /> Woo <br /> STARTER COURSE:Use CertainTeed's SviftStart 7.5/8"x 38-314" <br /> / <br /> ' t--t•(15 urn) <br /> 4 j r(ss mml-�' (194 mmx98ti mm)shingles or aslaner course consisting of die <br /> G/le' shingles from which the lower 5-5/8"(143 ram)has been removed <br /> (1ss urn) (see below).Remember,the sealant on starter courses should lie as <br /> TI.- I con) a (13-Ut1 '�` 13atmm1 close as possible to the eaves edge of the roof <br /> Figure JI-3 I 39-3/8"11000 mml <br /> STEEP SLOPE h-- Starter Shingle 1- . <br /> (194 mml <br /> list FOUR nails and four spots of asphalt roofing cement for every r __ _ _ - 1�. <br /> full shingle as shown below.Asphalt roofing cement meeting bSTM t Remove this portion <br /> D4586 Type D is suggested.Apply f'(25 tom) spots of asphalt t s <br /> roofing cement as shown. <br /> CAUTION:Excessive use of roofing cement can cause shingles to Figure i1-5:Make starter shingles by removing 5-58'below. <br /> blister. Next,cut 59127 mm)oil the length of the first starter course shingle. <br /> Install this single on the lower left corner of the roof.Make sure there <br /> is 1/2'(13 mm)lefi overhanging both rakes and eaves if drip edge is <br /> 1 being used.If you are not using drip edge,make the overhang 3/4°(19 <br /> U7M' 1'125 min) • • 1'125 mmH ram).Continue pith full-length saner course shingles along the eaves. <br /> (156 1 % r n <br /> Raolivq Cemam <br /> I.- 12-1g +f« 13-1N + 12-1N <br /> OEmml (331mmi (3$mml <br /> rysla¢`p` O Poo\iscY <br /> I� Figure II-1 <br /> eve <br /> STEPPED-OFF DIAGONAL METHOD hart �°�..+` oQ,,� <br /> FOR CLEAN-DECK APPLICATION °x's <br /> 000 <br /> PREPARING THE DECK: S o ,m / Sacs <br /> ns" <br /> • Apply underlayment as required,CertaluTeed suggests that a ` �: ,�.,��.s <br /> layer of shingle underlayment be applied.For 1R fire rating, '' 10994`w.asw <br /> underlayment is generally required.Apply Rat and unwrinkled. 1� '�ses�asmrix'ssese\aa`se� <br /> ••� F3'`Ta.ga91.:0c3\k ea. <br /> • Apply Snap chalklines to assure shingles will be correctly aligned. e+ e.toeaee' <br /> Expose all shingles 5-5/8"(143 mm). <br /> ALIGNMENT:Snap horizontal and vertical chalkWes to help assure Figure 11-6 <br /> consistent 5-5/8"(143 mm)exposure of all shingles and to align <br /> diagonal offsets from course to course.Use the shingle's"shiplap" 1ST COURSE:Cut the 3/8"x 5-5/8'(9.5 mm x 143 mm) shiplap <br /> feature to obtain 5-5/8"043 mm)exposure by aligning the shingle's piece(upper left corner)from a full shingle and apply the remaining <br /> 3/8"(9.5 min)shiplap edge with the top edge of the shingle beneath. shingle at lower left corner of roof,aligning left and bottom edges <br /> Maintain the chosen offset consistendy from course to course flush with starter shingle. <br /> throughout the entire roof application.Fasten all shingles as shown AND COURSE:Cut 5"(127 ram)off the left side of a shingle and <br /> in the"Fastening"section. install this 34-3/8"(873 mm)piece over and above the first course <br /> shingle,in line with the left edge of the first course.Expose the <br /> bottom 5.5/8' (143 mm) of the first course shingle.Align shiplap <br /> notch with top edge of shingles below. <br /> CERTAINTEED SHINGLE APPLICATORS MANUAL Chapter II 105 <br />