My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12988924
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
15-XXXXXX
>
12988924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 8:00:13 PM
Creation date
7/31/2025 2:09:13 PM
Metadata
Fields
Template:
Permits
Permit Address
14391 KEIL RD NE
Permit City
Aurora
Permit Number
555-15-006723-STR
Parcel Number
041W11A 00405
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Aron Faegre,AIA,PE 520 SW Yamhill Street Portland Oregon 97204 (503)222-2546 FAX/222-6529 faegre�aearthlink.net <br /> Alternative Methods Appeal for Yellow Gate Corporate Hangar Echo,Aurora Airport <br /> November 5,2015 <br /> A. Code Section for which alternative method being proposed: <br /> 412.4.1 Exterior walls. Exterior walls located less than 30 feet from lot lines or a public <br /> way shall have a fire-resistance rating not less than 2 hours. <br /> Proposed Design: <br /> • New Hangar Echo: This is a Type 11-13 construction Group III hangar per Table 412.4.6 <br /> and does not require fire sprinklering. Section 412.4.1.2 requires a 2 hour east wall on <br /> the east wall because it is less than 30 feet from the adjacent 30 foot wide public way. In <br /> lieu of the 412.4.1 2 hour wall proposed alternative is: fire water sprinklers at 0.25 gpm <br /> higher sprinkler standard for 100%of the building, and NFPA 13 Section 11.3.3 Water <br /> Curtain on the east wall of Echo Hangar. <br /> Describe Reason for Alternative: <br /> • Existing 30 ft easement and fire lane on east side of building, combined with sprinklers <br /> provide equivalent alternative. <br /> • The new hangar is to be constructed to Type II-B fire safety with fire water sprinklering <br /> to the higher standard of OSSC 412.4.6 Exception 2 even though the higher standard is <br /> not required. <br /> Describe Why, How, etc. the Proposed Alternative is Equivalent and Meets the Intent of the <br /> Code in Terms of"Strength, Effectiveness, Fire Resistance, Durability, Health, and Safety": <br /> • Our work with the State Building Codes and State Fire Marshal's office has confirmed <br /> that fire sprinklering of hangars, and constructing them of non-combustible materials, is <br /> the most important method of maintaining fire safety in hangar developments. Copies of <br /> surveys of hangar fires(attached) supports this. <br /> B. Code Section for which alternative method being proposed: <br /> Table 602: 2 hr walls when separation is less than 5 ft. <br /> Proposed Design: <br /> • New Hangar Echo: This is a Type I1-B construction Group III hangar per Table 412.4,6 <br /> and does not require fire sprinklering. Table 602 requires a 2 hour wall on the west wall <br /> [ of Hangar Echo and a 2 hour wall on the adjacent existing east wall of Hangar Charlie, <br /> �r because the separation to an assumed property line between them is less than 5 feet. In <br /> lieu of Table 602 2 hour wall proposed alternative is: fire water sprinklers at 0.25 gpm <br />
The URL can be used to link to this page
Your browser does not support the video tag.