Laserfiche WebLink
PLUMBING FIXTURE REQUIREMENTS <br /> 411/ TOTAL OCC.=313/2=157 <br /> 157/50=4 MALE W C.REQUIRED,8.5 ACTUAL <br /> 157/50=4 MALE LAV'S REQUIRED,7.5 ACTUAL <br /> 157/50=4 FEMALE W.C.REQUIRED.11.5 ACTUAL <br /> 157/50=4 FEMALE LAYS REQUIRED,75 ACTUAL <br /> 1. <br /> ii. Temp Modular Code Summary <br /> Code Summary <br /> Occupancy: E Separated Use <br /> Sprinkled: No(all units to be spaced 20'apart) <br /> Construction: V-B, No Sprinklers <br /> Area: 1,549sf per building x 4=6,196 sf total <br /> Occupants: 45 per building x 4=180 total <br /> I1Plumbing Fixture Requirements: <br /> •Note that these buildings will use the restrooms <br /> in the existing high school building(see attached <br /> code summary for reference). <br /> Total Occ=180/2=90 <br /> 90/50=2 male WC required,4.5 available <br /> 90/50=2 male Iav's required,3.5 available <br /> 90/50=2 female WC required,7.5 available <br /> 90/50=2 female lay's required,3.5 available <br /> ` 1. <br /> I_ <br /> Once permits are issued, Project#2 (Temp Modulars)will proceed with all haste in order to provide <br /> more space to students for COVID spacing. Upon completion of Project#1, classes currently meeting in <br /> the existing two modular buildings will relocate to the new Temp Modulars, at which time the existing <br /> units will be disassembled in preparation for starting Project#1. <br /> After TCO for Project#1 we would propose a condition of final Occupancy to be that we remove the <br /> modular buildings associated with Project#2 . This would ensure that there would be no overlap of <br /> occupancy at any time between the two projects,which would also ensure that the campus is not <br /> overloaded for plumbing or any other safety issues. <br /> Please let me know if anything else is needed for clarity. <br /> Rich Clausen <br />