My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13001240
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
13001240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 8:00:16 PM
Creation date
8/5/2025 2:59:52 PM
Metadata
Fields
Template:
Permits
Permit Address
2707 MARANATHA CT SE
Permit City
Turner
Permit Number
555-21-008001-STR
Parcel Number
083W25C 00500
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLUMBING FIXTURE REQUIREMENTS <br /> TOTAL OCC.•313/2=15/ <br /> 157/50.4 MALE W.C.REQUIRED,8.5 ACTUAL <br /> 157/50=4 MALE LAV'S REQUIRED.7.5 ACTUAL <br /> 157/50.4 FEMALE W.C.REQUIRED.11.5 ACTUAL <br /> 157/505 4 FEMALE LAV'S REQUIRED,7.5 ACTUAL <br /> 1. <br /> ii. Temp Modular Code Summary <br /> Code Summary <br /> Occupancy: E Separated Use <br /> Sprinkled: No(all units to be spaced 20'apart) <br /> Construction: V-B,No Sprinklers <br /> Area: 1,549sf per building x 4=6.196 sf total <br /> Occupants: 45 per building x 4= 180 total <br /> Plumbing Fixture Requirements: <br /> Note that these buildings will use the restrooms <br /> in the existing high school building(see attached <br /> code summary for reference). <br /> Total Occ=180/2=90 <br /> 90/50=2 male WC required,4.5 available <br /> 90/50=2 male lay's required,3.5 available <br /> 90/50=2 female WC required,7.5 available <br /> 90/50=2 female lay's required,3.5 available <br /> 1. <br /> Once permits are issued, Project#2 (Temp Modulars)will proceed with all haste in order to provide <br /> more space to students for COVID spacing. Upon completion of Project#1, classes currently meeting in <br /> the existing two modular buildings will relocate to the new Temp Modulars, at which time the existing <br /> units will be disassembled in preparation for starting Project#1. <br /> After TCO for Project#1 we would propose a condition of final Occupancy to be that we remove the <br /> modular buildings associated with Project#2 . This would ensure that there would be no overlap of <br /> occupancy at any time between the two projects,which would also ensure that the campus is not <br /> overloaded for plumbing or any other safety issues. <br /> Please let me know if anything else is needed for clarity. <br /> Rich Clausen <br />
The URL can be used to link to this page
Your browser does not support the video tag.