My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13006625
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
19-XXXXXX
>
13006625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 8:00:20 PM
Creation date
8/6/2025 12:01:55 PM
Metadata
Fields
Template:
Permits
Permit Address
22285 YELLOW GATE LN NE STE #102
Permit City
Aurora
Permit Number
555-20-005530-STR
Parcel Number
041W11A 90001
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Alternate Material(s) and/or Method(s) Application <br /> Marion County Public Works <br /> I/gr SI55 Sifverton Rd NE <br /> Salem OR 97305 <br /> OREGON <br /> Phone: (503)588-5147 Fax: (503)588-7948 E-mail:Buildin•In co,marion.or.us <br /> 104.11 Alternative materials, design and methods of construction and equipment. <br /> The provisions of this code are not intended to prevent the installation of any material or to prohibit any <br /> design or method of construction not specifically prescribed by this code, provided that any such alternative <br /> has been approved. An alternative material, design or method of construction shall be approved where the <br /> building official finds that the proposed design is satisfactory and complies with the intent of the provisions <br /> of this code, and that the material, method or work offered is, for the purpose intended, at least the equivalent <br /> of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety. <br /> 104.11.1 Research reports. Supporting data, where necessary to assist in the approval of materials or <br /> assemblies not specifically provided for in this code, shall consist of valid research reports from approved <br /> sources. <br /> 104.11.2 Tests. Whenever there is insufficient evidence of compliance with the provisions of this code, or <br /> evidence that a material or method does not conform to the requirements of this code, or in order to <br /> substantiate claims for alternative materials or methods, the building official shall have the authority to <br /> require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as <br /> specified in this code or by other recognized test standards. In the absence of recognized and accepted test <br /> methods, the building official shall approve the testing procedures. Tests shall be performed by an approved <br /> agency. Reports of such tests shall be retained by the building official for the period required for retention of <br /> public records. <br /> PROJECT INFORMATION AND LOCATION <br /> Permit or Activity Number:555-20-005530-STR <br /> Site Address:22285 Yellow Gate Lane,Suite 102.Aurora.Oregon <br /> Brief Description of Project: <br /> A 274 x 32'modular office for the use of a aircraft flight simulator. <br /> PROPERTY OWNER . <br /> Name:Life Flight Network Phone: ( )503-678-4364 I Fax: ( ) <br /> Address:22285 Yellow Gate Lane,Suite 102 City/State/Zip Aurora,Oregon 97002 <br /> APPLICANT-(It Other Than Owner) <br /> Name:Aron Faegre Phone: ( )503-880-1469 Fax: ( ) <br /> Address:520 SW Yamhill Street Pldl City/State/Zip Portland.I <br /> Relationship to owner:Architect and Engineer <br /> DESCRIBE THE REASON FOR THE PROPOSED ALTERNATIVE:. <br /> The modular wall system used for the interior partitions has small amounts of plywood in their construction which doesn't meet the letter of the OSSC 603.1 <br /> for Type➢-B buildings. LFN desires to use this pre-manufactured modular system as it is an efficient system and has minimal actual fuel load. <br /> The attached drawings show that the panel system is generally a rigid foam with gypsum board exterior both sides.Plywood is sandwiched within <br /> the loam T approx one quarter of lha panels. The loam complies with 603.1 12)and 2603.3 because it has a Flame Spread of 20 and a Smoke Developed 400 <br /> Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.