Laserfiche WebLink
Marion county <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> STYE EVA.~UA~I'ON A.PPROV~,, <br /> <br /> An inspection has been made and your property has <br />been approved for the installation of an On-site sewage <br />disposal system. The results of that inspection and <br />specifications for the sewage system are on the <br />attached reports. The approved sewage disposal area <br />includes area for the initial sewage system and full <br />replacement area to be used in the event of the failure <br />of the initial system. <br /> This approval is given on the basis that the lot <br />or parcel will not be further partitioned or subdivided <br />and that conditions on this property and on adjacent <br />properties are not altered in any manner which would <br />prohibit the issuance of a permit. Soils in the <br />approved area shall not be altered or modified by <br />cutting, filling, or other developmental activities <br />which would impede the suOoessf~l operation oX the <br />initial or replacement soil absorption systems. FaiLure <br />to comply with the above items may void this approval. <br /> This report is not a permit to install the sewage <br />system. A permit m~$t be obtained before any system <br />construction occurs. A permit may be issoed only after <br />the property has been found to be compatible with <br />applicable LCDC acknowledged local comprehensive land <br />use plan. A Statement Of Land Use Compatibility or its <br />equivalent is required before a construction permit can <br />be issued_ <br /> A detailed plot plan of the proposed system must <br />be submitted with the permit application before the <br />cQnstruotion-ins~allation permit can be issued. The <br />system must be installed by the property Owner or a DEQ <br />licensed septic installer. <br /> This site evaluation report is valid until an on- <br />site sewage system is installed pursuant to the <br />construction permit obtained from this office, or until <br />earlier cancellation pursuant to the Environmental <br />Quality Commission rule~. Subject to the above, this <br />report runs with the land and will automatically <br />benefit subsequent owners. <br /> Our office hours are Monday through Friday, <br />to 4:30. Please contact our office if you have any <br />questions concerning this report. <br /> <br />Robert Fost~r, ~eg~ste~ed Sanitarian <br /> <br />Senator Buildir~g * 220 High Street NE · Salem, Or~$ol1 97301-3670 <br /> <br /> <br />