Laserfiche WebLink
Oa~ 0 Lu~J~nao <br />gUILOING IN~PIE(TION <br /> <br />PLANNING & <br />ENFORCEMENt <br />~s03~ $88.5038 <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMENT <br /> SI~ ~VALUATIOI~ APPROVAL <br /> <br /> An inspection has been made and your property has <br /> been approved for the installation of an on-site sewage <br /> disposal system. The results of that inspection and <br /> specifications for the sewage system are on the <br /> attached reports. The approved sewage disposal area <br /> includes area for the initial sewage system and full <br /> replacement area to he used in the event of the failure <br /> of the initial system. <br /> This approval is given on the basis that the lot <br /> or parcel will not be further partitioned or subdivided <br /> and that conditions On this property and on adjacent <br /> properties are not altered in any manner which would <br /> prohibit the issuance of a permit. Soils in the <br /> approved area shall not be altered or modified by <br /> cutting, filling, or other developmental activities <br /> which would impede the successful operation of the <br /> initial or replacement soil absorption systems. Failure <br /> to comply with the above items may void this approval. <br /> This report is not a permit to install the sewage <br />system. A permit must be obtained before any system <br />construction occurs. A permit may be issued only after <br />the property has been found to be compatible with <br />applicable LCDC acknowledged local comprehensive land <br />use plan. A ~tatement of Land Use Compatibility or its <br />equivalent is required before a construction permit can <br />be issued. <br /> A detailed plot plan of the proposed system must <br />be submitted with the permit application before the <br />construction-installation permit can be issued. The <br />system must be installed by the property owner or a DEQ <br />licensed septic installer. <br /> Thi~ site evaluation report is valid until an on- <br />site sewage system is installed pursuant to the <br />construction permit obtained from this office, or until <br />earlier cancellation pursuant to the Environmental <br />Quality Commission rules. Subject to the above, this <br />report runs with the land and will automatically <br />benefit subsequent owners. <br /> Our office hours are Monday through Friday, <br />to 4:30. Please contact our office if you have any <br />questions concerning this report. <br /> <br />Rob rt Foster, Registered Sanitarian <br /> <br />Senator 8ulldlng 220 High Stre~ NE Salem, O~egon 97301-3670 <br /> <br /> <br />