My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13015349
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
23-XXXXXX
>
13015349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 8:00:14 PM
Creation date
8/7/2025 1:06:37 PM
Metadata
Fields
Template:
Permits
Permit Address
11677 SUBLIMITY RD SE
Permit City
Sublimity
Permit Number
555-23-006531-STR
Parcel Number
081W33B 04100
Permit Type
Structural
Extra Information
Alternate Material(s)and/orMethod(s) Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternate Material(s) and/or Method(s) Application <br /> Marion County Public Works <br /> Le, Marion county 5155 Silverton Rd NE <br /> Salem OR 97305 <br /> OREGON <br /> Phone: (503) 588-5I47 Fax: (503) 588-7948 E-mail: Buildingco.marion.or.us <br /> 104.11 Alternative materials, design and methods of construction and equipment. <br /> The provisions of this code are not intended to prevent the installation of any material or to prohibit any <br /> design or method of construction not specifically prescribed by this code, provided that any such alternative <br /> has been approved. An alternative material, design or method of construction shall be approved where the <br /> building official finds that the proposed design is satisfactory and complies with the intent of the provisions <br /> of this code, and that the material, method or work offered is, for the purpose intended, at least the equivalent <br /> of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety. <br /> 104.11.1 Research reports. Supporting data, where necessary to assist in the approval of materials or <br /> assemblies not specifically provided for in this code, shall consist of valid research reports from approved <br /> sources. <br /> 104.11.2 Tests. Whenever there is insufficient evidence of compliance with the provisions of this code, or <br /> evidence that a material or method does not conform to the requirements of this code, or in order to <br /> substantiate claims for alternative materials or methods, the building official shall have the authority to <br /> require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as <br /> specified in this code or by other recognized test standards. In the absence of recognized and accepted test <br /> methods, the building official shall approve the testing procedures. Tests shall be performed by an approved <br /> agency. Reports of such tests shall be retained by the building official for the period required for retention of <br /> public records. <br /> PROJECT INFORMATION AND LOCATION <br /> Permit or Activity Number:555-23-006531-SIR <br /> Site Address:11677 Sublimity Road <br /> Brief Description of Project: <br /> • <br /> New covered area over existing playground,contractor submitted,architect requesting alternate <br /> PROPERTY OWNER <br /> Name:cascade View Free Methodist Church Phone: ( )5039499842 Fax: ( ) <br /> Address:11677 Sub,imity Road City/State/Zip Sublimity,or 97385 <br /> APPLICANT—(If Other Than Owner) <br /> Name:Leah McMillan Phone: ( )5035804171 Fax: ( ) <br /> Address:3050 W Hester City/State/Zip Boise, ID 83702 <br /> Relationship to owner: <br /> DESCRIBE THE REASON FOR THE PROPOSED ALTERNATIVE: <br /> The proposed covered structure is not fully occupied,does not have walls or a ceiling and is constructed of heavy timber columns and a metal roof. <br /> There is no power or gas and it has a low fire load and minimal risk.The building next door is sprinklered and has multiple exits provided on all sides. <br /> The covered structure has been located 10'away from the existing building and 10'from the opposite property line It is set over the existing playground to provide shelter <br /> during PE classes and recess.It will not impact the exiting from the church.The current yard is fenced for the protection of students.with several gates, <br /> Page 1 of2 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.