Laserfiche WebLink
[~UILDING INSPECTION <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNJTY DEVELOPMENT <br />DEPARTMENT <br /> <br /> SITE ~VALUATION APPROVAL <br /> <br /> An inspection has been made and your property has <br />been approved for the installation of an on-site sewage <br />disposal system. The results of that inspection and <br />specifications for the Sewage system are on the <br />attached reports. The approved sewage disposal area <br />includes area for the initial sewaqe system and full <br />replacement area to be used in the event of the failure <br />of the initial system. <br /> This approval is given On the basis ~ha~ the lo% <br />or parcel will not be further partitioned or subdivided <br />and that conditions on this property and on adjacent <br />proporties are not altered in any manner which would <br />prohibit the issuance of a permit. Soils in the <br />approved area shall not be altered or modified by <br />cutting, filling, o~ other developmental activities <br />which would impede the successful operation of the <br />~nitial or replacement soil absorption systems. Failure <br />to comply with the above items may void'this approval, <br /> This report is not a permit to install the sewage <br />system. A permit must be obtained before any system <br />construction Occurs. A permit may be issued only after <br />the property has bee~ found to be compatible wlth <br />applicable LCDC acknowledge~ local comprehensive land <br />use plan. A Statement of Land Use Compatibility or its <br />equivalent is required before a construction permit can <br />be issued. <br /> A detailed plot plan of the proposed system must <br />be submitted with the pmrmit application before the <br />construction-installation permit can be issued. Tho <br />system must be installed by the property owner or a D~Q <br />licensed ~ep%ic installer. <br /> This site evaluation report is valid until an on- <br />s~te sewage system is installed pursuant tO the <br />construction permit obtained from this office, or until <br />earlier ca~cellation pursuant to tho Environmental <br />Quality Commission rule~. Subject to the above, %his <br />report runs with the land and will automatically <br />benefit s~bseque~t owners. <br /> Our office hours are Monday through Mriday, 8:00 <br />to 4:30. P~ease contact our office if you have any <br />questions concerning this report. <br />R~~st~red <br /> ¢ , Sanitarian <br /> <br />Senator Building · 220 High Street NE Salem, Oregon 97301-3670 <br /> <br /> <br />