Laserfiche WebLink
DIRECTOR <br /> <br />8'dlLDIN'~ IN$1PEC¥1ON <br /> <br />ENFORCEMENT <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> SITE EVALUATION APPROVAL <br /> <br /> An inspection has been made and your property has <br />been approved for the installation of an on-site sewage <br />disposal system. The results of that inspection and <br />specifications for the sewage system are on the <br />attached reports. The approved sewage disposal area <br />includes area for the initial sewage system and full <br />replacement area to be used in the event of the failure <br />of the initial system. <br /> This approval is given on the basis that the lot <br />or parcel will not be ~ther partitioned or subdivided <br />an~ that conditions on this property and on adjacent <br />properties are not altered in any manner which would <br />prohibit the issuance of a permit. Soils in the <br />approved area shall not be altered or modified by <br />cutting, filling, or other developmental activities <br />which would impede the successful operation of the <br />initial or replacement soil absorption systems. Failure <br />to comply with the above items may void this approval. <br /> Thls report is net a permit to install the sewage <br />system. A permit must be obtained before any system <br />construction occurs. A permit may be issued only after <br />the property has been found to be compatible with <br />applicable LCDC acknowledged local comprehensive land <br />u~e plan. A Statement of Land Use Compatibility or its <br />equ&valent is required before a construction permit can <br />be issued~ <br /> A detailed plot plan of the proposed system must <br />be submitted with the permit application before the <br />construction-installation permit can be lss~ed. The <br />system must be installed by the property owner or a DEQ <br />licensed septic installer. <br /> This site evaluation report is valid until an on- <br />site sewage system is installed pursuant to the <br />construction permit obtained from this office, or until <br />earlier cancellation pursuant to the Environmental <br />Quality Commission rules. Subject to the above, this <br />report runs with the land and will automatically <br />benefit subsequent ownerS. <br /> Our office ho~rs are Monday through Friday, 8:00 <br />to 4;30. Please contact our office if you have any <br /> <br />Robert Foster, Registere~ Sanitarian <br /> <br />Senator Building 220 High Street NE Salem, Oregon 9730t.3670 <br /> <br /> <br />