Laserfiche WebLink
ENFORCEMENT <br />OFFICER <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DEPARTMENT <br /> SITE EVALUATION APPROVAL <br /> <br /> An inspection has been made and your property hms <br />been approved for the installation of an on-site sewage <br />disposal system. The results of that inspection and <br />specifications for the sewage system are On the <br />attached reports. The approved sewage disposal area <br />includes area for the initial sewage system and full <br />replacement area to be used in the even= of the failure <br />of the initial system. <br /> This approval is given on the basis that the 10t <br />or parcel will not be further partitioned or subdivided <br />and that conditions on this property and on adjacent <br />properties are not altered in any manner which would <br />prohiblt the issuance of a permit. SO~15 in the <br />approved area shall not be altered or modified by <br />cu%ting, filling, or other developmental activities <br />which would impede the successful operation of the <br />initial or replacement soil absorption systems. Failure <br />to comply with the above items may void this approval. <br /> This re~ort is not a permit to install the sewage <br />system. A permit must be obtained before any system <br />construction occurs. A permit may be issued only after <br />the property has been fOUn~ to be compatible with <br /> <br />applicable LCDC acknowledged <br />use plan. A Statement of Land <br />equivalent is required before <br />be issued. <br />A detailed plot plan of <br />be submitted with the permit <br /> <br />local comprehensive land <br />Use Compatibility or its <br />a constructio~ permit can <br /> <br />the proposed system must <br />application before the <br /> <br />construction-installation permit can be issued. The <br />system must be installed by the property owner or a DEQ <br />licensed septic installer. <br /> This site evaluation report is valid until an on= <br />site sewage eye=em is installed pursuant to the <br />construction permit obtained from this office, or until <br />earlier cancellation pursuant %o the Environmental <br />Quality Commission rules. Subject to the above, this <br />report runs with the land and will automatically <br />benefit subsequent owners. <br /> Our office hours are Monday through Friday, 8:00 <br />to 4:30. Please contact our office if you have any <br />questions concerning this report. <br /> <br />Robert ~oster, R~pistered Shni~ari~n <br /> <br />Budding , 220 High Street NE · Salem, Oregon 973(~i-3670 <br /> <br /> <br />