My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1304311
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
93-XXXXX
>
Permit - 1304311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:36:15 AM
Creation date
9/4/2003 4:32:15 PM
Metadata
Fields
Template:
Permits
Permit Address
100 DETROIT AV
Permit City
Detroit
Permit Number
93-03272
Permit Type
SEPTIC
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County <br /> <br /> OREGON <br />COMMUNITY DFVI::LOPMENT <br /> DEPARTMENT <br /> <br />CraiB O. Lu~:iema~ <br /> <br />BUILDING INSPECTION <br />(503) <br /> <br />Ra~dafl ~ranke <br />Cary H~r' <br /> <br />ADMINISTRA~VE <br />OFFICER <br />~n Roudyb~sh <br /> <br />DAPJLENE MANN <br />100 S- DETROIT AVENUE <br />DETROIT, OREGON 97342 <br /> <br />SUBJECT: KORNER POST RES~AUP~LNT. SEPTIC FAILURE <br /> SITE 92-177~, T.10S, R.SE, SECTION. 01 <br /> <br />This is a follow up to my May 21, 1992 letter to you <br />outlining the septiG system repair required at the Korner <br />Post Restaurant. As of this date no attempt has been made <br />to correct the existing health hazard therefore sewage <br />effluent is still exposed to the ground surface affecting <br />the health and welfare of the community. <br /> <br />plans for the appropriate repair must be submitted by <br />January 6, 1992. Failure to submit the plans will result <br />in referal of your file te the State Department of Envi-- <br />ronmental Quality for enforcement. Following review of <br />the plans, if approved, repair should begin immediately <br />and be completed within 30 days of beginning construc- <br />tion, allowing for weather conditions. <br /> <br />I suggest that you follow the procedure outlined in the <br />May 21, 1992 letter a~d gather the information to prepare <br />plans for the repair. Call, if you have any questions. <br />am usually in the office between 8 and ~0 <br /> <br />LEE A- GRIMES <br />SOIL SCIENTIST <br /> <br />MARION COUNTY <br />BUILDING ~NSPECTIONS <br /> <br />c/c DEQ <br />c/G M~LRION COUNTY LEGAL COUNCIL <br /> <br />Senator guild[.g - 220 High Street NE Salem, ~regon 97301~670 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.