Laserfiche WebLink
Section 109 <br /> <br /> REFUND OF APPLICATIONS <br /> <br />Any fee erroneously paid o~ collected may be refunded. NO refunds ~hal]. be <br />made for less than $6.00. No fee shall be refunded except upon wrigte~ <br />requeBt by the orlginai permittee not later than 180 days after ghe dage of <br />the fee payment. <br /> <br />I. BUILDIN(~, ELECTRICAL, PLUMBING~ ~ MEC~%NICAL APFL~CATION$ <br /> <br /> A. ~e~it Application i~ canceled or wltbdra~ an~ no plans review <br /> ha~ been done. <br /> <br /> 1. 80% of the ~it fee shall be refu0ded. <br /> 2.All of th~ plans r~vi~w ~ee shall be r~unded. <br /> All of the State Surcharge shall ~e refunded. <br /> 4. goning surcharge shall b~ r~funded if th~ application ha~ <br /> ~ot completed zoning review. <br /> <br /> B. Pe~it Ap~licatio~ is cancele~ Or withdrawn after plans have been <br /> reviewed, but before ~mit is issued. <br /> <br /> 1. No plans review fee shall be r~fund~d. <br /> 2. 80% of tha ~er~it ~ee shall be refundsd. <br /> <br /> 4. No zoaing surcharg~ shall be refunded. <br /> <br />II. SUBSURFACE ON-SIT~ SEWAG~ (O~ C~T. 340, 71-140-5) <br /> <br /> A. No refund on a~ application w~ere field work has been done or <br /> oth~r sub,tan=ia1 review of %h~ app%ication. <br /> <br />When an applicatio~ has been canceled or withdrawn, before any <br />field work or other substantial review of the apglicaticn ha~ been <br />completed a refund shall be made of the DEQ ~urcharge and 80% Of <br />the a~plication fee. <br /> <br />We refund on a DEQ surcharge unless the application is canceled <br />within ~he same month that i~ is made, as all D~Q surcharge~ are <br /> <br />applications for tha= month. <br /> <br />~ANUFACTUP2~D STRUCTURES <br /> <br />Pe~mi~ a~plicatien has been canceled or withdrawn and no review <br />work has been completed: <br /> <br />80% of ~he per, it fee shall be refunded. <br />Ail of the State Surcharge shall be refunded. <br />All zoning surcharg~ shal% be refunded unl~s~ zoD~ review <br />was completed. <br /> <br />P~mit ~ppliua%io~ has been canceled or withdrawn <br />work completed, but before permit is issued: <br />1- 80% of the pe~it fee shall be refunded. <br /> All o~ the Stat~ Surcharg~ shall be refunded. <br />3. No zoning ~urcharge shall be refunded. <br /> <br />after review <br /> <br />2192 <br /> <br /> <br />