Laserfiche WebLink
MARION COUNTY BUILDING iNSPECTION <br />'COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE * Room 132 · Salem, Oregon 97301-3670 <br />Office Hour~: 8:00.4:30 * Phone: (503) 588-5147' * 24-HR InspecUon Line: (503) 588-7~JO4 <br /> <br /> ~[TEEYALUATIOH APPROVAL AND SEPTIC PERHZT <br /> This property has been evaluated for the feasibility of the inst*all~tion of a septic <br /> approval was granted. The approval z~ ~;Oec~TiC to the area ~ested, eyed the septic 5yste~ Mttst <br />~'' located in'the i~eediate area of the t~s~ p~t~. unless o~herwise au~hOl'ized by this office, <br />,., new si~e evaluatxon e~ay ~e required ~f ,~he system [s proposed ~o~' a diff'etent area on the <br /> This mgproval [$ ~ven on the basis t~at the lot or pa~"cel aill not be furti}e~ partitioned <br /> or subS[v~ded and ~hat condit~oOs on ~S p~operty ertl.on adSacen~ properties are not altered <br />altered or modztied by cutt.gng~ fi.,l~ing:~ or,other developmental activities which would ~,~pede <br />~': succe~sf~l,?peration of the ~.n~tlal or 'replaceeent soil absorption systems. Failure to comply <br /> ~he adore &Tams Ray vofd ~his apptoval.~, · <br /> <br /> Th.i'~ s~e eva~ua~on approval'runs ~i~h~ the land, but the per,it Is non-transferable and <br /> · non-refundable. <br /> K~ep ~hi~.docu~e~t with your records. ~how'this pmrMit to the septt~ installer prior to <br /> Installation of the System. Any deviation from ~he approved plan ~nust ~ave prior approwl <br /> ~,his office. <br />~ "~h~ ~ol. lo~ing.cOnS~rUction ~pecificatiohs shai'l apply ~o the t~')sta~la~io~ of the in~t'i~l <br /> ~eptic system: <br /> <br /> TYPE OF INITIAL SYSTEM: S~ANDAR~. <br /> MINIMUM SEPTIC TANK CAPACITY:l~88 GALLOHS <br /> LINEAL FEET OF' DRAZHFIELD: 458 <br /> TYPE OF DISTRIBUTION: SERIAL <br /> '. ..DISPOSAL TRENCH· DEPTH: ~ ZNCHES~ MINIMUH;24 INCHES, MAXIMUM <br /> · TOTAl. BRAIN MEDIA DEPTH: 'INCHES <br /> , ,DRA~N, ME~A UNDE~ P~PE: <br /> · .HI~IHUM SOIL BACKFILl: 1~ ~NCHES <br /> GR~YJH9 WATER ~NTER~EPTOR: ~ INCHES <br /> <br />· The disposal trenches ale const?uc~ed t'~) fee~ wide a~d on mi~iwuM t~ (I~) foot centers <br /> a~d?~th..n~ l~e ,eEceed~g 1~ fe~ ~ 'teq~th. The trenches and per'h)reted p~pe <br /> installed level (+/- one inch) andlco~t'oured to follow ~he natural ground surface, <br /> <br />:3. <br /> <br /> COMMENTS AND CONDITIONB <br /> <br />~T.HIS SEPT:lC REVIEW WAS COM'>LETED BY LEE A~ GRIMES ON <br />~1. 1995. REFER TO REVISED S~:TE.PLAN OF FIELD BT~J<EQUT ~AT'EO <br />A~SOC~ATE~ W~TH ~EAiNFIEI,,9 OONST~UCTIOH. EEHOVE AS MUCH ROCK <br />PEON BACKFILL HATEE~AL A8 ~OSS~BLE. U~E ~,[X INOHES OF STRAW <br />RATHER THAN PAPE~ OR FILTE ~ FABEI~ TO COVER THE QRAINROCK <br />FOR MORE PROTE~TIOfl TO THE ~RAIM~INE PIPINg. CONSTRUCT THE <br />DRAINFIELD LINES A8 CURRENTLY FIEL~ STAKED FOR LOCATION WI'IH <br />M~NOR CO,REnT,ON TO MAINTAIN AB CLOSE TO A 24" TRENCH DEPTH <br />A~ POSSIBLE. AN EFFLUENT PUMP M~GHT BE NECESSARY TO <br />THE DRAINL~NE ~RENCHE~ AT ~HE CORRECT OEPTH. <br />Th~ f;ys~m,I t'+uSt b~ In,peet'ed p~ior ~o Cover. To <br />~,,,~,~mpe~?'ion of r:o~)~].ei.'e~ wor(~ ca~,l ~i88-'79~4 <24- Our <br /> <br /> <br />