Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br />285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br /> <br /> Office Hours: 8:00-4:30 · PI)UI[~t~EI~ ~ · 24-HR Inspection Une: (503) 588-7904 <br />D~TE/TIHE : ~1/~EI/96 ~6:§8 PERHTT NO : 96-~24 <br /> e S~. I F i, 1 D e li ST/~TUS .- ISSUED <br /> ZSSUED : !!1/~8/1996 <br />CQ~Pr~'tYi'oN .J VR=I~ PArETO EXPTRE : <br /> <br /> .~,nche~. The M~ni.MUm net opening height shall be 24 inches. <br /> .IlO MiniMtiM net czear open[ng area shall be at least 5.7 <br /> square feet.. (R-210.2) <br /> ,1,1. The garage shall be completely sep~arated from the residence <br /> and its attic area by means of 1/..~-inch gypsum board or <br /> equivalent applied to the garage s~de. The door between <br /> the garage and residence shall-be equipped with solid wood <br /> doors nor less than I 3/8 inches in thickness or 28-Minute <br /> ~fire rated, or equivalent. (R-209.2) <br /> ,12. in sei'sMic zone 3, water heaters shall be anchored or <br /> str.apped, to r?.sist horizontal d~splaceMent due to <br /> earthquake MOTIOn. (P-1310 (e) <br /> 13. Appl.iances th.at generate a ~l.ow, .spa. rk or flame capable of <br /> igni~inq gaso~in~ vapors ama zoca~eo in a garage shall be <br /> iDstal,l~.d'wi, th b.ur.ners, b?ner iqnitipn devices or heating <br /> eJeMen~s ama switches at zeas~. 18 incl3es above the floor <br /> level (H-1006.3) <br /> 14. SMoke detectors shall be installed outside of each separate <br /> sleeping are,a in the immediate vicinity of the bedrooms and <br /> on each additional story of the dwelling including <br /> basements. Ail detectors shall be interconnected such that <br /> the actuation of one alarm wi]]. actuate all the alarms in <br /> the individual unit and shall provide an alarm which will <br /> be audible in all sleeping areas. (R-215.1) <br /> 15. This dwelling plans uses a combination of Brace Wall Panels <br /> (BP) and Alternate Bra(~ed Wall Panels (ABP) to Meet the <br /> code requirements for lateral wall bracing. Insure that <br /> all BP's and ABP's are located as indicated on the plans <br /> and constructed as shown. <br /> ~4. Roof trusses ..... are reauired, tOr. be .....deqigned by an. Oregon <br /> registered Engineer or Archztect. For trusses Manufactured <br /> by an approve8 fabrication plant, have tile design and <br /> layout drawings available at the construction szte for the <br /> framing inspection. All job site cutting or Modification <br /> of the roof trusses shall be clearly, shown in the <br /> engineer's design ca].cu]ations and ara~inqs. If trusses <br /> a. re to be.built, at ~he jo~ sit?, submit t~e engineer's <br /> oesign ama construction pzans ~o the Marion County Building . <br /> Oepartment prior to st~r~.of ?o~truc~ion and ha~e the <br /> approved drawings avaizaoze a~ ~ne si~e for the framing <br /> inspection. , <br /> 17. Energy Path ~1 is based on R-21 wall insulation, R-25 <br /> underfloor insulation, R-38 vaulted ceiling insulation, R- <br /> 38 flat ceiling insulation, R-21 basement ~alls, R-15 ~lab <br /> floor edge insulation, R-8 forced air duct insulation& 8.48 <br /> U-value windo~ class, 8.58 U-value skylight class, 8.,~4 U- <br /> value Main entry door with a MaXimum of 24 square feet and <br /> 8.28 U-value doors, other than the Main entry <br /> (including the door between the heated dwelling and the <br /> unheated garage). <br /> <br /> <br />