Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br />DATE/TTHE <br /> <br /> 285Chumh StreetNE · Room 132. Sa~m, Oregon97301-3670 <br /> Office Houm:8:00~:30.~~il~ll;~l~l[M'. 24-HRInepection Une:~03)588-7904 <br /> : ~]/~8/96 16:43 PEP. J~ZT HO : 96-~!F698 <br /> de Si I F il lin STATUS : ISSUED <br /> ~SSUED <br /> <br /> P~,E 3 <br /> inches. The minimum net opening height shall be 24 inches. <br /> The m~n~mum net clear open~ng afea s~a}l be at least 5.7 <br /> <br />~. ~ne garage sna~ ne comp~.ese~y separated from the residence <br /> and its attic ar~a by means of 1/2-inch gypsum board or <br /> eou~valent applied to the arage s~de. The door between <br /> t~e garage and residence s~al] be equipped with solid wood <br /> doors not less than I ~/8 znches zn thickness m ~O-mznute <br /> fire rated, or equivalent. (R-20~.2) <br />17~ In seimmic zone S, water heaters shall be anchored or <br /> strapped to resist horizontal displacement due to <br /> earthquake motion. (P-1~10 (e)) <br />1~. Appliances that generat~ a glgw, 9p~rk or flame capable of <br /> igniting gasoline vapors ann zoca~eo in a garage shall be <br /> i~stal~ed w~th burners, burner igniti?~ devices or heating <br /> e~emen~s ann switches at least 18 inches above the floor <br /> level (H-1006.~) <br />J4. Smoke detectors shall be instaIIed outside of each separate <br /> sleeoing area in the immediate vicinity of the bedrooms and <br /> on e~ch-additional story of the dwelling including <br /> bas~ments. All detectors shall be interconnected such that <br /> the actuation of one alarm will actuate all the alarms in <br /> the individual unit and shall provide an alarm which will <br /> be audible in ali sleeping areas. (R-215.1) <br />15. This dwelling plans uses.a combination of Brace Wall Panels <br /> (BP) and Alternate Braceo WaJJ Panels (ABP) to Meet the <br /> code requirements for lateral wall bEacing. Insure that <br /> a~ BP's and ABP's are located as inoicated on the plans <br /> and constructed as shown. <br />~6. Roof trusses are required to be des~gned by an Oregon <br /> registered Engineer or Architect. For trusses manufactured <br /> by'an approve~ fabrication plant, have the design and <br /> layout drawings available at the construction s~te for the <br /> frame, nD inspection. All &ob site cutting or modification <br /> of the roof trusses shall be clearlx shown in the <br /> engineer's design calculations and ~rawings. If trusses <br /> are to be built at the &ob site, submit the engineer's <br /> design and construction plans to the Marion County Building <br /> Department prior to start of construction and have the <br /> ~pproved drawings available at the si~e for the framing <br /> snspection. <br />17. Energy Path ~1 is based on R-~I wall insulation, <br /> underfloor insulation, R-~O vaulted ceiling insulation, R- <br /> ~8 flat ceiling insulation, R-21 basement walls, R-15 slab <br /> floor edge insulation, R-8 forced air duct insulation. 8.40 <br /> U-value w~ndow class, 0.58 U-value skylight class, 8.54 U- <br /> value main entry door with a MaXimum of ~4 square feet and <br /> 0.20 U-value doors, other than the Ma~n entry <br /> (including the door between the heated dwelling and the <br /> unheated garage). <br /> <br /> <br />