My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SESPNEW - 1337362
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
96-XXXXX
>
SESPNEW - 1337362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2010 1:22:37 PM
Creation date
12/10/2003 8:22:10 AM
Metadata
Fields
Template:
Permits
Permit Address
14323 STENBOCK WY NE
Permit City
Aurora
Permit Number
555-96-01087
Parcel Number
041W02D 00602
Permit Type
SESPNEW
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARION COUNTY BUILDING INSPECTION <br /> COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 588-7904 <br /> <br />DATE/TIME <br />TYPE <br />OCCUPAHCY <br /> <br />n <br /> <br /> SEPTIC PERMIT <br />: 84/;)3/96 13:18 PERMIT HO' : ?6-81887 <br />: SP STATUS : ISSUED <br />: A-3 ISSUED : 04/83/1996 <br /> TI] EXPIRE : 84/83/1997 <br /> PAGE 31 <br />staff finds soil ~oisture conditions acceptable. The <br />CAPPING FILL ~aterial Must be inspected and approved prior <br />to placement. The fill shall be of the same textural <br />class~ or one class finer~ than the native topsoil. The <br />disposa]: field area ~mst Ee scarified to deStroy any <br />vegetatzve Mat on ..,le surface. Fill ~ai:erial shall be <br />evenly graded to a final deoth of ten (]8) inches over the <br />gravel zn an equal or loop Brai¥~field. <br />The area approved for th~ dis~,osal field is located o~ the <br />ad~iacent airport property. A R~CORQED EASEMENT IS REQUIRED <br />TO INSTALL THE DRAINFIELD IN THIS AREA. The permit is being <br />;issued based on a letter of intent fr*o~, the Oregon Dept. of <br />Transportation to i~ssue a ]ease for use of the Iar~d for the <br />drainfield. This ML~st be a non-exoiring agree~ent which is <br />to continue as long the on-site s~Wage"sy~te~,~ is needed for <br />the building. Construction of the sewage system shall not <br />CoMMence un~il our office has received"a copy of the <br />recorded easement agree~ent. Occupancy of thb building will <br />be delayed until an approved sept~c s~ste~,~ has been <br />installed to serve the building. ' <br />The septic system Must be inst~lled exactly as shown on the <br />attached stakeout plan. (received Feb 21, '1996) The field is <br />build in two cells with a Hydro-Tek distributinq valve <br />alterr~atinG flow between the two cells. - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.