Laserfiche WebLink
5) The use will not have a significant adverse impact on potential water impoundments identified in the <br />Comprehensive Plan and not create significant conflicts with operations included in the Comprehensive <br />Plan inventory of significant mineral and aggregate sites. <br /> <br />There are no nearby water impoundments identified in the Marion County Comprehensive Plan that <br />would be impacted by this proposal, as Mill Creek is not an artificial body of water. Also, there are no <br />nearby aggregate sites for the proposal to impact. The criterion is met. <br /> <br />11. The purpose of the Floodplain Overlay Zone is to promote public health, safety and general welfare to minimize <br />public and private losses due to flood conditions. The criteria and standards which must be satisfied are listed in <br />Section 17.178.050 and 17.178.060 of the Marion County Code (MCC). <br /> <br />12. Flood Insurance Rate Map # 41047C0703G indicates that the proposed placement site is in the Zone AE. Based <br />on land use case CU/FP20-033 and the FIRM panel map, the BFE in the proposed location is 376.6 feet. <br /> <br />13. MCC chapter 17.178.050 (Conditional Use procedures and requirements) B-E pertain to this permit: <br /> <br />B. When base flood elevation data and floodway data have not been provided in accordance with <br />MCC 17.178.030, the applicant, with the assistance of the floodplain administrator, shall obtain and <br />reasonably utilize any base flood elevation data or evidence available from a federal, state or other <br />source in order to determine compliance with the flood protection standards. If data are insufficient, the <br />floodplain administrator may require that the applicant provide data derived by standard engineering <br />methods. <br /> <br />A BFE was established for the non-farm dwelling on the property through land use case CU/FP20-033. <br />The BFE established was 376.6’ (NGVD); this was confirmed using the cross section provided for the AE <br />zone in FEMA FIRM map number 411047C0703G. The proposed manufactured home is located on this <br />cross section, and therefore this BFE is sufficient for this case. The criterion is met. <br /> <br />C. Prior to obtaining a building permit the owner shall be required to sign and record in the deed records <br />for the county a declaratory statement binding the landowner, and the landowner’s successors in interest, <br />acknowledging that the property and the approved development are located in a floodplain. <br /> <br /> The signing of a declaratory statement will still be made a condition of approval. <br /> <br />D. Prior to obtaining a building permit, commencing development or placing fill in the floodplain the <br />applicant shall submit a certification from a registered civil engineer demonstrating that a development <br />or fill will not result in an increase in floodplain area on other properties and will not result in an <br />increase in erosive velocity of the stream that may cause channel scouring or reduce slope stability <br />downstream of the development or fill. <br /> <br />The applicant shall provide evidence in the form of engineer certification that the proposed manufactured <br />home placement complies with this criterion as a condition of approval. <br /> <br />E. The applicant shall provide an elevation certificate signed by a licensed surveyor or civil engineer <br />certifying that the actual elevations (in relation to mean sea level) of the lowest floor (including <br />basement) and all attendant utilities of all new or substantially improved residential structures including <br />manufactured dwellings meet the requirements of MCC 17.178.060(A), (B) and (C), where applicable, as <br />follows: <br /> 1. Prior to construction (based on construction drawings); and <br /> 2. Once the floor elevation can be determined (based on the building under construction); and <br /> 3. Prior to occupancy (based on finished construction). <br /> <br />This proposal is for a residential structure, the applicant shall submit an elevation certificate at the times <br />listed above. The first elevation certification, based on construction drawings, was submitted with this <br />application. Submission of the subsequent elevation certificates shall be a condition of approval. <br /> <br />14. MCC chapter 17.178.060 A, & D-H pertain to this project. <br />