My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SESPNEW - 1464818
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
97-XXXXX
>
SESPNEW - 1464818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2010 11:09:23 AM
Creation date
8/9/2004 1:26:18 PM
Metadata
Fields
Template:
Permits
Permit Address
10031 BROWNELL DR SE
Permit City
Aumsville
Permit Number
555-97-01409
Parcel Number
081W19 00700
Permit Type
SESPNEW
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARION COUNTY BUILDING INSPECTION <br /> COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97301-3670 <br />Offioe Hours: 8:00.4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: [503) 373-4427 <br /> <br />DATE/TIHE <br />TYPE <br />OCCUPANCY <br /> <br />=R-3 <br /> <br />#9= 38 <br /> <br />SZTE EVALUATION APPROVAL <br /> <br />~T~PI~V~L HO -- 97-l)1499 <br /> ; N:'PROVED <br />~PPROVED : g3/17/1997 <br /> <br /> P~E,E <br /> THE PITS ARE BACK-FILLED. RECOMMEND DRY SOIL CONSTRUCTION TO <br /> PREVENT EXCESSIVE SOIL COMPACTION DURING INSTALLATION. <br />2. The attached ORANGE CARD must be posted at the count% road. <br />3. The site must be protected from traffic, livestock~ Tarming <br /> or o~her damaging activities. <br />4. This system mus~ be i~spected prior to cover. Whe)'~ worm is <br /> complete, call our Automated Inspection Request Line~ <br /> at 373-~427~ to r~q~est an "8~1" PRE-COVER inspection. <br /> Leave a message f0~ ~he inspector to ~ndicate the name of <br /> the Lns~aller and phone number, the size of tank ~nstalled <br /> and the length of dra~nfieId. An i~spection should be <br /> completed w~thin seve~ (7) days. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.